Forum quick links
EAp2-2 90.1 HVAC Compliance Forms
CI-2009 EAp2:Minimum Energy Performanceposted by George Bender on
When completing page 1 the HVAC Mandatory Provisions nothing applies with exception to the Load Calcs and construction docs check columns because the central plant serving this floor is outside the
Combining Occupant Comfort and Alt. Commuting Transportation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jonathon Bates on
We are considering combining the occupant comfort survey and the alternative commuting transportation survey into one survey.
Verification of future commuter rail station.
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Breck Baird on
Does anyone have an example letter used to verify a future commuter rail station's plan and funding?
Greenhouse submeter part of landscape irrigation?
EBOM-2009 WEc1:Water Performance Measurementposted by Jessica Hawley on
Our project has an irrigation submeter that covers approximately 75-80% of the irrigated landscape.
When Fundemental Commissioning Should start
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jalal Avades on
We have a project that is currently in construction and the client would like to go LEED.
Using AEDG
NC-2009 EAp2:Minimum Energy Performanceposted by David Tratt on
There are two AEDG's for small office buildings. Which should be used for a 12,000 sf building to achieve the 10-14% improvement over 2007? The 30% or the 50%?
Fresh Air Measurements on Rooftop Units
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Christopher Pinkowski on
I am applying this credit to ten rooftop units that lack a straight duct section long enough to traverse with a pitot tube.
Football field is a countable area?
NC-2009 WEc1:Water Efficient Landscapingposted by Marcio Alberto Casado Pereira on
I dont know if anybody had asked this before, but does the football field counts in the sum of the total landscape area of a football arena? We are working on a project that all the landscape area,
Natural Ventilation
NC-2009 IEQc2:Increased Ventilationposted by Torsten Biernat on
We have a four story office building with natural ventilation. All the rooms are single-sided. We want to show that the window area is big enough to exceed the ASHRAE requirements by 30%. 1.
Heating and Cooling Ez, and Occupant Diversity
NC-2009 IEQp1:Minimum IAQ Performanceposted by Hernando Miranda on
It seems that the certification reviewers do not know when heating and cooling occur in a space.