When completing page 1 the HVAC Mandatory Provisions nothing applies with exception to the Load Calcs and construction docs check columns because the central plant serving this floor is outside the LEED boundary and scope of the project. This situation also applies to certain systems listed on page 2 of the 90.1 hvac part II form.
Basically, will the reviewer interpret the pages as incomplete? If so, should additional document be be uploaded explaining the situation?