Forum quick links
AHU measurements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Luis Parada on
In our building we have two main AHU that supply 26 AHU (one for each floor of the building) and then we have VAVs for each zone in each floor. Do I need to perform measurements just in the two ma
v2.2 CIR applied to v2009
posted by Bill Swanson on
In another thread on this page, a LEED Reviewer mentioned being able to apply v2.2 "LEED Interpretations" to v2009 projects. That did not make sense to me.
'Leaks in Return Ducts and Air Handlers..be checked..repaired'
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Michelle Bracewell-Musson on
The Contractor will not be using the HVAC during a minor alteration and there is no HVAC scope except for Air balancing and cleaning of ductwork. How much sealing is required?
Defined Flush out Area
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Thomas Boyd on
Hello everyone - Our project's registration details reference building square footage as 51,441. However, we've only finished 40,100 sqft.
Kitchen Sinks in Dorms
NC-2009 WEc3:Water Use Reductionposted by Lauren Fakhoury on
We are working on a college dormitory and trying to calculate the daily uses for kitchen sinks. The only kitchen is on the first floor of the dorm and not in each dorm room.
Task Lighting Required at Copy and Fax Machines
posted by Hernando Miranda on
In December of 2010 a LEED project that was certified as Gold was denied the Lighting Controls credit because task lighting was not provided at copy and fax machines.
No new parking?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Lawrence Lile on
We have a "zero lot line" LEED project, where the LEED project boundary is essentially the same as the footprint of the building. There is no new parking provided within the LEED boundary.
Wet/Dry Vacuums - What Product Category
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Kelly Witosky on
I am hoping for some guidance on what product category wet/dry vacuums fall into.
EAc1 Design Review Question - Seeking Guidance ASAP
NC-2009 EAc1:Optimize Energy Performanceposted by Joshua Bloom on
If I submit EAc1 in my design review and it gets sent back as likely approved, can I still have the ability to change some things before I submit again for Construction Review?
Renewable Energy and Green Power
NC-2009 EAc1:Optimize Energy Performanceposted by Joshua Bloom on
In EAc1 Related Credits (pg. 260 of BD&C Book) it says that you can mitigate energy use impacts by using renewable energy: refer to EAC2, and EAC6.