Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Previously Registered Project with New Team

General forums
posted by  Shannon Allison  on 

We are working on a project that is going through redesign with a new project team. The project was registered during the original design. How do we assign the project to the new team?

1
Fri Apr 6, 2012, 4:46 pm

Multifamily mid-rise and the IEQ prereq re: ASHRAE 62.2-2007

LEED for Homes (LEED-H) Forum
posted by  Andrea Marzullo  on 

ASHRAE 62.2-2007 was required in the Florida Building Code in 2007.

1
Fri Apr 6, 2012, 11:41 am

Water Flow Diagram

Pilot-Credits PC25:Water Metering and Reporting
posted by  Donald Bauman  on 

This comment relates to Project ID: 1000012468 and try to comply with Pilot Credit 25 - Water Metering: •The credit requires us to submit a water flow diagram indicating all sources and uses of wa

1
Thu Apr 5, 2012, 4:48 pm

Specific Forum

General forums
posted by  Emily Catacchio  on 

Marco,

I'm not entirely sure what it is you're asking, would you mind clarifying so I can direct you to somewhere more specific on LEEDuser?

Thank you.

1
Wed Apr 11, 2012, 12:49 pm

backup energy source

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD

1
Fri Apr 6, 2012, 6:32 pm

Green Cleaning

NC-2009 IDc1:Innovation in Design
posted by  Lauren Ford  on 

We have a hotel project in Virginia and are wondering if anyone has successfully used the Virginia Department of Environmental Quality's "Virginia Green Lodging Facility" requirements as a baseline

0

What to do when electricity produces less carbon than gas?

NC-2009 EAc1:Optimize Energy Performance
posted by  Raphael Sperry   on 

Hello all, I'm working on a project for an owner who operates their own hydropower dam. It's an older facility and it the electricity it produces registers as basically carbon neutral.

0

Is it possible to achieve this credit through plant troughs?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Keerthi Ratnayake  on 

Dear All, We are currently working on a five storey office building and instead of going to a vegetated roof we are planning to have plant troughs all around the building in every level.

1
Mon Apr 9, 2012, 12:20 pm

Pre-Engineered Wood Trusses?

NC-2009 MRc7:Certified Wood
posted by  Kory Beighle  on 

When the credit states that..."These components include at a minimum, structural framing and general dimensional framing, flooring, sub-flooring, wood doors and finishes." Does this include pre-eng

1
Mon Apr 9, 2012, 3:36 pm

Integrated Water Budget

General forums
posted by  ROBIN KINERK  on 

For LEED 2012 is the integrated water budget for just outdoor irrigation use or will the LEED 2012 integrated water budget include indoor and outdoor use?

0