Forum quick links
Previously Registered Project with New Team
posted by Shannon Allison on
We are working on a project that is going through redesign with a new project team. The project was registered during the original design. How do we assign the project to the new team?
Multifamily mid-rise and the IEQ prereq re: ASHRAE 62.2-2007
posted by Andrea Marzullo on
ASHRAE 62.2-2007 was required in the Florida Building Code in 2007.
Water Flow Diagram
Pilot-Credits PC25:Water Metering and Reportingposted by Donald Bauman on
This comment relates to Project ID: 1000012468 and try to comply with Pilot Credit 25 - Water Metering: •The credit requires us to submit a water flow diagram indicating all sources and uses of wa
Specific Forum
posted by Emily Catacchio on
Marco,
I'm not entirely sure what it is you're asking, would you mind clarifying so I can direct you to somewhere more specific on LEEDuser?
Thank you.
backup energy source
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD
Green Cleaning
NC-2009 IDc1:Innovation in Designposted by Lauren Ford on
We have a hotel project in Virginia and are wondering if anyone has successfully used the Virginia Department of Environmental Quality's "Virginia Green Lodging Facility" requirements as a baseline
What to do when electricity produces less carbon than gas?
NC-2009 EAc1:Optimize Energy Performanceposted by Raphael Sperry on
Hello all, I'm working on a project for an owner who operates their own hydropower dam. It's an older facility and it the electricity it produces registers as basically carbon neutral.
Is it possible to achieve this credit through plant troughs?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Keerthi Ratnayake on
Dear All, We are currently working on a five storey office building and instead of going to a vegetated roof we are planning to have plant troughs all around the building in every level.
Pre-Engineered Wood Trusses?
NC-2009 MRc7:Certified Woodposted by Kory Beighle on
When the credit states that..."These components include at a minimum, structural framing and general dimensional framing, flooring, sub-flooring, wood doors and finishes." Does this include pre-eng
Integrated Water Budget
posted by ROBIN KINERK on
For LEED 2012 is the integrated water budget for just outdoor irrigation use or will the LEED 2012 integrated water budget include indoor and outdoor use?