Forum quick links
CI Toilets for employees vs customers
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sustentator Argentina on
We are pursuing CI for a retail space inside a huge mall.
Move historic & blighted buildings to LT High Priority Site
posted by Mara Baum on
I really like some of the changes that LEED 2012 makes with respect to historic and blighted buildings.
Move historic & blighted buildings to LT High Priority Site
posted by Mara Baum on
I really like some of the changes that LEED 2012 makes with respect to historic and blighted buildings.
Low-Emitting Interior Credit: Positive Improvements
posted by Nicole Munoz on
The revisions in the proposed EQ credit Low-Emitting Interiors will strengthen the requirements, heighten the level of transparency, and increase the value of 3rd party certification.
how to determine cost-effectiveness
Pilot-Credits PC26:Advanced Energy Meteringposted by monu goyal on
how can we do calculations to determine cost-effectiveness for the incremental cost of the entire system and individual end-uses.
Not that so
posted by Ricardo Sobral on
I work for an international project and construction company implementing LEED certification. In my company, safe & safety issues are almost a dogma.
Reversing Exemplary Performance Claim
NC-2009 IDc1:Innovation in Designposted by Gail Vittori on
Our project is pursuing more than 4 innovation strategies. It is eligible and anticipates to achieve exemplary performance for 2 design phase credits.
Regional Materials - Mileage Info
NC-2009 MRc5:Regional Materialsposted by Mike Maas on
What should be done for a product that has numerous locations for extraction. For instance, my steel supplier has 47% regional materials, but the sources are from about a dozen different mills.
Reintroduce two free CIRs
posted by Mara Baum on
Remember when USGBC granted each project two free CIRs?
EQ Credit: Acoustical Performance - Needs cleaning
posted by Joseph F. Bridger on
If someone else has not submitted a comment, I have more than I submitted (one per credit per person and cannot edit!) 1. suggests a noise range must be met.