Forum quick links
Site Assessment Credit
posted by Melissa Wrolstad on
Since this credit would need to happen before schematic design - doesn't it make sense to combine it with the Integrative Process section?
Low-Emitting and Fuel Efficient Vehicles
posted by Melissa Wrolstad on
Doesn't it make sense for this credit to be available to all building types?
Residential district density
CI-2009 SSc2:Development Density and Community Connectivityposted by monu goyal on
We have recently received final design review for our CI project, but the reviewer has denied SS Credit 2 Development density because of just figure not mentioned for residential district density.
ACP SSc1-6 "Previous, non-park use of the project site"
NC-2009 SSc1:Site Selectionposted by Natalie Tan on
Hi, I would like to clarify if our non-US project can qualify for this credit.
Included materials for cost basis?
posted by Nadav Malin on
The Materials Life-cycle disclosure and assesment credit, Option 1 and Option 3, includes a pretty specific list of mateirals that MAY be included:
Default Recycling Content
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Ralf Lehmann on
Is it possible to assume recycled content to be 25% postconsumer for steel comparable to New construction?
EAc1 weather data
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
Hello everybody! For the climate data I wonder whether the utilization of the software Meteonorm, or of similar software, could be a valid solution for LEED.
Material reuse
NC-2009 MRc3:Materials Reuseposted by Ameet AA on
If the materials are to be reused, ship from another country would it assist for attaining any LEED Credits? As i understand it would not be sustainable in terms of carbon emission.
openings on a direct naturally ventilated space
NC-2009 IEQp1:Minimum IAQ Performanceposted by Francesco Passerini on
A storage room with openings on a direct naturally ventilated space must meet the requirements of ASHRAE 62.1 for spaces without direct openings to the outdoors ventilated through adjoining rooms (
Carpet Material ??
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Jan Senica on
We wanted to know if you could please help us out with the carpet material. At the entrance of each door, we are suppose to provide a carpet mat that is suppose to trap dust particles & contain