Forum quick links
EBOM WEc4 Cooling Tower Water Management as C&Sv2009 ID Credit
CS-2009 IDc1:Innovation in Designposted by Liz Voeller on
The LEED Project Submittal Tips guide for C&S from GBCI (published 12/23/2011) states that EBOM WEc4.1 Cooling Tower Water Management is allowed in BD&C v2009 as an ID credit.
Arduino and CO2 Sensor
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Francisco Sanchez Arroyo on
We are pursuing IEQc1 and we would like to use CO2 sensors connected to an Open Source Arduino micro controller in order to manage the alarms, interface with other systems and publish to Pachube (h
LEEP AP,
CI-2009 IDc2:LEED Accredited Professionalposted by Cyril Knabe-Nicol on
Hello, everyone, I just wanted to have clarification regarding the LEED AP, if we have in the design team or in the team undertaking the Assessment someone who is a LEED AP.
Land trust
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gabriela Hernández Castillo on
Our project has very limited landscape options and I just found out about the offsite land donation. We are by no means familiar with the Land trust nor the EPA level III ecoregion.
Sample form of LEED HC IEQ c2
posted by James Chueh on
Hi all, When I look into the sample form downloaded from LEED ONLINE, the "Table IEQc2-4.
Minimum ventilation in Storage, electrical rooms, lift m/c rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Arub Vijay on
Do we need to comply with the ventilation rates in Table 6-1 (ASHRAE 62.1-2007) for electrical rooms, lift machine rooms, electrical rooms etc?
Misunderstood case 1
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Stéphane Paris on
I'm working on a project in an urban space that have Local Zoning Ordinance.
Another CxA Scenario?
NC-2009 EAc3:Enhanced Commissioningposted by Christopher Heine on
We have a project over 50,000 sf in DD phase and are in early talks with a potential Facility Manager. Can a FM or a disinterested party from that FM firm serve as a CxA for EAc3?
IEQp2 - EBO+M
posted by SIG - Sustainability Main Account on
Recently, IEQp2 for EBO+M projects are also requiring additional documentation that is not clearly requested in reference guide or on LEED Online.
IEQc3.5 - EBO+M
posted by SIG - Sustainability Main Account on
Another issue with existing buildings is with previously existing permanently installed walk-off surfaces.