Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EBOM WEc4 Cooling Tower Water Management as C&Sv2009 ID Credit

CS-2009 IDc1:Innovation in Design
posted by  Liz Voeller  on 

The LEED Project Submittal Tips guide for C&S from GBCI (published 12/23/2011) states that EBOM WEc4.1 Cooling Tower Water Management is allowed in BD&C v2009 as an ID credit.

1
Wed Feb 22, 2012, 4:18 am

Arduino and CO2 Sensor

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Francisco Sanchez Arroyo  on 

We are pursuing IEQc1 and we would like to use CO2 sensors connected to an Open Source Arduino micro controller in order to manage the alarms, interface with other systems and publish to Pachube (h

1
Mon Feb 27, 2012, 9:55 pm

LEEP AP,

CI-2009 IDc2:LEED Accredited Professional
posted by  Cyril Knabe-Nicol  on 

Hello, everyone, I just wanted to have clarification regarding the LEED AP, if we have in the design team or in the team undertaking the Assessment someone who is a LEED AP.

1
Tue Feb 21, 2012, 5:34 am

Land trust

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Gabriela Hernández Castillo  on 

Our project has very limited landscape options and I just found out about the offsite land donation. We are by no means familiar with the Land trust nor the EPA level III ecoregion.

1
Tue Feb 21, 2012, 7:56 pm

Sample form of LEED HC IEQ c2

LEED for Healthcare forum
posted by  James Chueh  on 

Hi all, When I look into the sample form downloaded from LEED ONLINE, the "Table IEQc2-4.

0

Minimum ventilation in Storage, electrical rooms, lift m/c rooms

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Arub Vijay  on 

Do we need to comply with the ventilation rates in Table 6-1 (ASHRAE 62.1-2007) for electrical rooms, lift machine rooms, electrical rooms etc?

1
Fri Feb 24, 2012, 7:59 pm

Misunderstood case 1

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Stéphane Paris  on 

I'm working on a project in an urban space that have Local Zoning Ordinance.

1
Wed Feb 22, 2012, 2:52 am

Another CxA Scenario?

NC-2009 EAc3:Enhanced Commissioning
posted by  Christopher Heine  on 

We have a project over 50,000 sf in DD phase and are in early talks with a potential Facility Manager. Can a FM or a disinterested party from that FM firm serve as a CxA for EAc3?

1
Fri Mar 9, 2012, 4:24 pm

IEQp2 - EBO+M

General forums
posted by  SIG - Sustainability Main Account  on 

Recently, IEQp2 for EBO+M projects are also requiring additional documentation that is not clearly requested in reference guide or on LEED Online.

1
Thu Apr 12, 2012, 9:35 pm

IEQc3.5 - EBO+M

General forums
posted by  SIG - Sustainability Main Account  on 

Another issue with existing buildings is with previously existing permanently installed walk-off surfaces.

1
Thu Apr 12, 2012, 9:31 pm