Forum quick links
IEQp1 Table. Case 1
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Calloway on
I am working on the IEQp1 LEED form and ran into a couple problems when filling out the information.
Bottle filling stations
NC-2009 IDc1:Innovation in Designposted by Craig Phillips on
Is there an ID credit or other credit that can be acheived by providing bottle filling stations in the project? It seems that we could prove the savings of recycling or waste vs.
Metered Public Lav Faucets Giving Huge Water Savings!!!???
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Seema Pandya on
Is it just me or does the 0.25 gallons per cycle baseline for public metered lavs seem way to high?
Patient Rooms and Thermal Comfort Controls
posted by Susan Walter on
I've always counted the patient rooms as individual spaces, not shared spaces, and have provided a single T stat.
Exemplary Performance for IEQ C4 under LEED NC for Retail 2009
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Anders Olson on
The LEED NC for Retail 2009 rating system differs from the LEED NC 2009 rating system for IEQ C4 in that the retail system includes 6 options -- all those included in NC plus 'Furniture and Furnish
Calculating 90% rainfall compliance
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Simon Sue on
We're currently working on a high-rise commercial building, and hope someone could shed some lights on the following questions: 1.
HVAC on a green roof calculation
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Petr Vogel on
Hello, we are working on the project of a new commercial building where green roof is about 50 % of the whole roof.
Documentation
NC-2009 MRc4:Recycled Contentposted by Maura Adams on
Do I need to enter every single material used into the spreadsheet, or can I stop once I've reached the 10% or 20% threshold? Please tell me it's the latter!
WEp1 - Children's Water Closets Water Use
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ross Spiegel on
I am working on an elementary school project with flush valve type water closets sized for young children.
OPTION 3 - Survey Time
EBOM-2009 SSc4:Alternative Commuting Transportationposted by WAGNER OLIVEIRA SILVA on
We have same dubs about survey time.