Forum quick links
Automation Session at Greenbuild Shows Potential
posted by Nadav Malin on
There's a live video now from the LEED Automation session at Greenbuild, at which various Automat
Granite for Paving
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Udana Ratnayake on
Has anyone proved credit compliance using granite as the paving material? what's the SRI of granite?
Project impacts another area not a part of the Project Boundary
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Melissa Kemp on
My question is: What if a LEED project disturbs land owned by a different party? i.e. if they have to excavate in an adjacent parking lot to install utilities for the building seeking LEED.
Cooling tower's motor
NC-2009 EAc1:Optimize Energy Performanceposted by James Chueh on
Cooling tower's performance is covered in 90.1 Table 6.8.1G, but does its motor have to comply with Table 10.8 Minimum Efficiency for Motors?
ACP Regional Materials Calculator
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Mark Frey on
In the new ACP Documentation Guidance for Projects outside the U.S. (October 2011) they say, you should upload the completed "ACP Regional Materials Calculator".
diesel generator on-site
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Gellrich on
Hi everyone, we are working on a project that produces its electricity on-site via diesel generators.
Glass Piping vs Plastic (esp. PVC and CPVC)
Pilot-Credits MRpc54:Avoidance of chemicals of concernposted by David Weimann on
Would there be an opportunity here to include glass piping materials (esp for lab buildings and healthcare facilities) as a potential strategy to reduce the use of plastics which contain know hazar
Dual Faucets on Single Fixture
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Rick Servoss on
A pantry sink is being provided with a dual faucet fixture. One faucet is for pantry type applications, the other is a filtered faucet meant for human consumption.
Can A Dormitory Count for the 10 Units per Acre Requirement?
NC-2009 SSc2:Development Density and Community Connectivityposted by Landon Chapman on
I've got all options satisfied for Option 2 but I'm having trouble with the 10 units per acre requirement.
Future retail - walk off mat requirements
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ed Clark on
I am working on a multi-family residential project that includes some shell & core future retail space on the ground floor.