Forum quick links
WATER USE REDUCTION
CI-2009 WEc1:Water Use Reductionposted by sajeev john on
DOES THE COMMON TOILEST IN A FLOOR COME UNDER TENANT SCOPE? ENTIRE FLOOR IS OCUPIED BY SAME COMPANY? FLOOR IS MEANT TO BE RENT TO DIFFERENT TENANATS AND OUR COMPANY IS OCCUPYING THE ENTIRE FLOOR?
Shading devices vs daylighting
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Rudolph Schaar on
ASHRAE 189.1, 8.4.1.2 requires us to have permanent shading devices. We are attempting to achieve the Daylighting credit 8.1.
IIC in IEQc9
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Gary Madaras on
Just want to double check . . . As far as I can see, there are no IIC requirements in IEQc9. Can someone confirm please? Thanks.
Garage and technical rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by BH . on
Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them?
Green wall in a Lobby
CS-2009 IDc1:Innovation in Designposted by Anna Korinkova on
Hi, Our project team would like to use a green wall placed in our office building's atrium as an innovation in design credit.
Refrigerant Management Plan
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Chris Munn on
Does anyone know of a good resource to use as a template for developing a refrigerant management plan for a building?
Shading of Hardscapes
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by JOHN COOK on
We want to show that we are shading our hardscape but performing the necessary modeling of vegetation shadows at 10am, 12noon and 3pm on the summer solstice is proving difficult.
Ooptimize Energy Performance
CS-2009 EAc1:Optimize Energy Performanceposted by Paula Hernandez on
I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me, Thans
Buying & selling RECs
Schools-2009 EAc2:On-Site Renewable Energyposted by Renee Shirey on
If the RECs are sold (solar RECs) is there a requirement that the RECs HAVE to be solar, or can they be any kind of RECs (wind)?
LEED CI - S.S. credit 3.3 - Case 1 - Option 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Sheela I on
Our project area is less than 75% of the total building area - as we are one of the tenants in 25 floor building. So i guess the project would qualify under Case1 - Option 2.