Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ID Credit for 100% Outside air?

NC-2009 IDc1:Innovation in Design
posted by  Nelina Loiselle  on 

Has anyone tried pursuing an ID credit for using 100% outside air in the building's HVAC systems?

1
Fri Aug 12, 2011, 9:12 pm

Varying sill heights

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Sara Sweeney  on 

I am working on a project - a preschool, and the architect has windows with varying sill heights.

1
Mon Aug 15, 2011, 3:53 pm

"Borrowed Light" For Interior Rooms

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Vishnu Jhaveri  on 

We have few interior rooms on our project that “borrow” daylight through relites facing exterior window.

1
Thu Aug 18, 2011, 1:10 pm

C&S building with partial occupancy during construction

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Rubén M. R.  on 

Our 23-story building is about to start partial occupancy at floor 12th. The building's AHU will be controlled by a variable speed drive which will regulate automatically the air supply quantity t

1
Mon Nov 21, 2011, 3:35 am

Asphalt vapor barrier on roof

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Petra Hajná  on 

How do you see the use of hot air/flame applied bituminous sheets as a vapor barrier on roofs regarding VOC? Which category should I use?

1
Tue Jul 17, 2012, 8:12 pm

Exterior lighting power density

CI-2009 EAp2:Minimum Energy Performance
posted by  Edwin Wealend  on 

Hi we are working on a LEED-CI for retail and they have exterior lighting power that doesn't comply with ASHRAE Section 9.4.5 which is compulsory and non-tradeable with interior lighting.

1
Wed Aug 24, 2011, 7:21 pm

Major problem with the credit, in my opinion

Pilot-Credits PC19:Whole Building Reuse
posted by  Heather Walters  on 

As I see it the major issue with this credit is the 75% threshold in MR 1.1 &1.3. Consider two possible assemblies.

0

Counting surfaces

Pilot-Credits PC19:Whole Building Reuse
posted by  Bradley Guy  on 

Hello Heather, Your comments are just the kind of feedback this pilot process is intended to elicit.

1
Mon Aug 15, 2011, 5:16 pm

Energy and Water Data Release form - Option 3

Schools-2009 EAc5:Measurement and Verification
posted by  Rachel Birnboim  on 

If we pursue this option, are we only eligable for one point for this credit? That's what is coming up on my template, even though it says that i'm pursuing two credits.

1
Wed Aug 17, 2011, 4:26 pm

Hard copy signatures

General forums
posted by  Mike Barker  on 

My observations, from an international point of view, are as follows :- 1) A hard copy, in the form of a comitment by the engineer on a company letterhead with his full signature, will always com

0