Forum quick links
LEED Healthcare Forum
posted by Susan Walter on
Tristan, What are the plans to have LEED HC have its own forum like the other programs?
Fire Caulk
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lu Anne Nielsen on
Does fire caulk fall under "other sealants"?
AREA CRITERIA
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS.
Entrance lobby as live-work space
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
In my project there is a main entrance lobby that includes a permanently manned reception.
Sidewalk definition
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
How would the sidewalk length for the category "Sidewalk Intrusions" be measured for a project consisting of several buildings on a plaza. There are no defined sidewalks and nor driveways on the pl
EAp2 Case 2B Fulfillment
EBOM-2009 EAc1:Optimize Energy Performanceposted by Jessica Bruscato on
Being that my project is a convention center, it does not qualify for energy star.
Green Roof Installation Timing
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Jeremy Knoll on
I am working on a green roof in St. Louis, MO which is due to be complete by October.
Compliance with Appendix G ASHRAE
CS-2009 EAp2:Minimum Energy Performanceposted by Daniela Castro Salgado on
We have a 14 storie-152600sft building which we are interested in certifying, however, there are 2 problems: 1. The client does not want a water treatment plant. 2.
Site Master Plan - Light Pollution Reduction
Schools-2009 SSc9:Site Master Planposted by Anya Fiechtl on
Has anyone completed the light pollution portion reductin of this credit? Our project is an elementary school on a remote site that may accommodate future structures (classroom addition, staff hou
Filling the Master format template
CI-2009 MRc4:Recycled Contentposted by Santhosh Manavalan on
LEED CI 2009 template is asking us to divide the material cost of the project into two CSI Master format 03-10, 31 & 32; & CSI Master format 12. Could anyone explain me the foll: 1.