Forum quick links
IAQ Testing using screening tool.
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Marcia Weekes on
Has anyone had experience with meeting the IAQ testing requirements using the Directsense IAQ Plus Screening tool from Graywolf Sensing Solutions.
Energy Star Rated Equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Alex Spilger on
In regards to products that are included in this calculation, would a projector be included?
SIMULATION METHOD
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE.
Parking Lot Tree Canopy Coverage
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Rebecca Griffith on
We have been attempting to achieve this credit with tree canopy coverage in our parking lot.
MicroClimate Factor (Kmc) for Baseline and Design
NC-2009 WEc1:Water Efficient Landscapingposted by Maya Karkour on
Hi All, So I know that the MicroClimate Factor (Kmc) must be the same for the Baseline and the Design, but what if the Landscape types in the Baseline and the Design are not the same at all. .
IAQ Procedure as ASHRAE 62.1 Compliance Path
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Laura Case on
ASHRAE specifies that the Ventilation Rate Procedure or the IAQ Procedure can be used to ensure that mechanical ventilation systems meet ventilation requirements in ASHRAE 62.1 (Section 6.1).
Prescriptive Method - multiple VLT types
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Dana Murdoch on
Hi - I'm using the Option 2 - Prescriptive Approach for this credit, and I'm running into a few issues regarding the provided Excel spreadsheet.
Landscape irrigation baseline in California
NC-2009 WEc1:Water Efficient Landscapingposted by Brightworks Sustainability on
With the new state wide green building code and local municipal requirements for landscape irrigation, how is a baseline developed when regional requirements now approach what was a 50% reduction?
WE Pr1 - What does ADO stand for in the Process Water Use Sect?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Edna Bartolomei-Diaz on
We are using LEED 2009 for Retail: NC+MR templates, for one of our projects. In WE Pre-requisite 1Template, there is Process Water Use section. One of the column is named ADO.
Simple simulation question
NC-2009 EAp2:Minimum Energy Performanceposted by Timo Marquez on
This might be a rather simple question, but would like avoid confusion.