Forum quick links
What about shared Multi-Occupant spaces that are not classrooms?
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Grace Heicher on
Following Case 1, the LEED Reference Guide requires individual lighting controls in spaces occupied by individuals, and also adjustable controls for all learning spaces.
USGBC Webinar
posted by Sara Cederberg on
Hi everyone, please note that we here at USGBC are going to be discussing the revisions to the Daylight section in our upcoming webinar: https://video.webcasts.com/events/pmny001/viewer/index.jsp?
Showing energy savings in drug manufacturing facilities
NC-2009 EAc1:Optimize Energy Performanceposted by CRB Sustainability on
Has anyone performed an exceptional alculation to demonstrate energy savings in a drug manufacturing facility for EAc1?
LEED for Schools, or LEED NC ?
posted by Maya Karkour on
Hello, I was wondering if I could get your opinion on which LEED Scheme I should use. Our client wants to entirely refurbish a school block that is 100 years old.
Demolition debris / Land-clearing debris
CS-2009 MRc2:Construction Waste Managementposted by Petra Hajná on
What is the difference between these two categories? Demolition debris counts towards waste management and land-clearing doesn't.
Construction dates of bicycle networks
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Carrie Johansen on
It seems like this information may not be readily available for many bicycle networks. Has anyone else had difficulty finding information regarding bicycle network construction dates?
Building Envelope Requirements for Continuous Insulation
NC-2009 EAc1:Optimize Energy Performanceposted by Myra Villalobos on
We have a project that has structural masonry walls, and interior steel studs. Appendix G requires 7.5 c.i. for our walls, so I have two questions: 1.
Consider footnoting Table of Required Signatories in LOv3
posted by RETIRED on
I think Owner Required Signatories is a great addition for many of the prerequisites and credits where it is used. It has been a breath of fresh air to get owners on board with the requirements.
Absorption Chiller - District Heating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ralf Lehmann on
In my project there is an absorption chiller supplied by district heating. The building itself is also heated by district heating.
More LCA Score Questions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dirk Kestner on
Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100.