Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

What about shared Multi-Occupant spaces that are not classrooms?

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Grace Heicher  on 

Following Case 1, the LEED Reference Guide requires individual lighting controls in spaces occupied by individuals, and also adjustable controls for all learning spaces.

1
Tue Jul 26, 2011, 12:12 am

USGBC Webinar

General forums
posted by  Sara Cederberg  on 

Hi everyone, please note that we here at USGBC are going to be discussing the revisions to the Daylight section in our upcoming webinar: https://video.webcasts.com/events/pmny001/viewer/index.jsp?

0

Showing energy savings in drug manufacturing facilities

NC-2009 EAc1:Optimize Energy Performance
posted by  CRB Sustainability  on 

Has anyone performed an exceptional alculation to demonstrate energy savings in a drug manufacturing facility for EAc1?

0

LEED for Schools, or LEED NC ?

General forums
posted by  Maya Karkour  on 

Hello, I was wondering if I could get your opinion on which LEED Scheme I should use. Our client wants to entirely refurbish a school block that is 100 years old.

1
Fri Sep 23, 2011, 5:13 pm

Demolition debris / Land-clearing debris

CS-2009 MRc2:Construction Waste Management
posted by  Petra Hajná  on 

What is the difference between these two categories? Demolition debris counts towards waste management and land-clearing doesn't.

1
Tue Nov 8, 2011, 8:07 pm

Construction dates of bicycle networks

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Carrie Johansen  on 

It seems like this information may not be readily available for many bicycle networks. Has anyone else had difficulty finding information regarding bicycle network construction dates?

1
Mon Nov 7, 2011, 10:16 pm

Building Envelope Requirements for Continuous Insulation

NC-2009 EAc1:Optimize Energy Performance
posted by  Myra Villalobos  on 

We have a project that has structural masonry walls, and interior steel studs. Appendix G requires 7.5 c.i. for our walls, so I have two questions: 1.

1
Tue Jul 19, 2011, 7:27 pm

Consider footnoting Table of Required Signatories in LOv3

General forums
posted by  RETIRED   on 

I think Owner Required Signatories is a great addition for many of the prerequisites and credits where it is used. It has been a breath of fresh air to get owners on board with the requirements.

0

Absorption Chiller - District Heating

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Ralf Lehmann  on 

In my project there is an absorption chiller supplied by district heating. The building itself is also heated by district heating.

1
Tue Jul 5, 2011, 6:47 pm

More LCA Score Questions

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials
posted by  Dirk Kestner  on 

Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100.

0