FTE Calculations & Application
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Austin Evans on
I'm having a hard time understanding what I should actually use here to put in the online forms for FTE.
Energy simulation
CS-2009 EAc1:Optimize Energy Performanceposted by Redy Truccolo on
Hi, I'm running an energy simulation on a three floors office building. This building have also an entrance hall. The HVAC system for the office part is a VRV Fan Coil System with external air con
Sustainable Purchasing
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Jessica Bruscato on
I am interested in pursuing LEED EBOM certification for an existing convention center.
Purchase Tracking
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Shin-Ja Kammann on
The LEED certified building that I work in is a sports arena.
What happend if the result of SEP on GHG emission is "N/A"
EBOM-2009 EAc6:Emissions Reduction Reportingposted by David Feregrino on
Hi, I used the EPA's manager Program, and the result for GHG emission in MtCO2 were N/A, this result represents a problem to comply whit this credit? Thanks in advance.
Hybrid Compliance Using BOTH Standard CA AND VOC Content Paths
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Erik Ruoff on
Has anyone used both the standard California Department of Health AND the VOC limit path outlined in the PIEACP together in one project and been approved?
How much flexibilty do you have with what gets sub-metered?
NC-2009 EAc5:Measurement and Verificationposted by R. Ted Krasnesky on
Say you have a fairly complex project, but the facility engineers only want to sub-meter 7 electrical systems for measurement and verification.
Can a shell be LEED Core and Shell certified without HVAC?
CS-2009 EAc1:Optimize Energy Performanceposted by Lawrence Lile on
I've cross posted this in the LEED CS fundamental commissioning discussion since these two issues seem to be the showstoppers. We are working on a project that is a tenant finish-out shell.
ASHRAE 90.1 vs Local Energy Code
NC-2009 EAp2:Minimum Energy Performanceposted by Todd LaFreniere on
If the local energy code is more stringent with respect to building U-factors does the baseline model need to meet the local energy code?