Forum quick links
LEED for Retail: Qualifying for Option 4 (Parking Capacity)
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Klein on
LEED for Retail Option 4 Path 1 states "size parking capacity must meet but not exceed minimum local zoning requirements".
MRc4 forum and information
posted by Tristan Roberts on
Hi Nancy, I see that you're a LEEDuser member, which is great since you are new to LEED.
Open plan (individual workstations) with access to thermostat
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Stewart on
We have an open plan office area that contains 24 workstations. There are 3 thermostats that control the temperature in this open office plan area.
Grouping of spaces
CS-2009 IEQp1:Minimum IAQ Performanceposted by Anupam Jain on
I am working on a project with similar spaces repeating on each floor. I know LEED allows one to group spaces in some credits.
Accumulating Annexes in multi
posted by Paola Figueiredo, Newton Figueiredo on
The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for templates
Can a PC count for Campus?
Pilot-Credits PC41:Wastewater Managementposted by Prudence Ferreira on
If we were to certify a campus EBOM project and we pursued this credit for a campus wastewater treatment facility would this PC gain a point for each building that used the wastewater treatment cen
AASHE STARS / Climate Action Plan - Master Site Innovation
NC-2009 IDc1:Innovation in Designposted by M. Elbaum on
Any thoughts if an AASHE STARS rating for a college campus will earn you a Master Site Innovation credit? What about being an ACUPCC signatory and having a Climate Action Plan? These would be two
contact GBCI
posted by Tristan Roberts on
Is this for LEED registration or certification via LEED Online? Please use the "feedback" link on LEEDOnline.com to contact GBCI for help with this.
Weighted average for new construction + major renovation?
NC-2009 EAc1:Optimize Energy Performanceposted by Bethany Beers on
We are performing a review of an energy model for a project that is a major remodel of an existing space with addition of new square footage.
A & B bus lines - do they count separately?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jill Ziegler on
We are going for Exemplary Performance since we have 5 qualifying bus lines. Total (weekday) stops equals exactly 200, so we're good there.