Forum quick links
Views for an Apartment Building
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Lauren Fakhoury on
I'm working on documenting this credit for an apartment building but have a question about documenting it. Most of the floors are identical in terms of rooms square footage and layout.
"Blight" designation
Pilot-Credits PC19:Whole Building Reuseposted by Kath Williams on
The building we are reusing for a project is considered as "contributing" to the historic neighborhood.
LEED-CS v2.0 Title-24 2005 equivalent to ASHRAE 90.1-2004?
CS-2009 EAc1:Optimize Energy Performanceposted by Lauren Sparandara on
For projects registered under LEED-CS v2.0, is Title-24 2005 deemed equivalent to ASHRAE Standard 90.1-2004 for showing compliance with the EAc1 requirements?
Increase in FTE during performance period
posted by Matthew Perna on
The top floor of our 4 story building was fit out and rented toward the end of our performance period (it was shell space prior to this).
Appeal for 'dependent' credits
posted by Pablo Fortunato Suarez on
The project is under EBOM v3. We intend to appeal a credit - EAc2.1 - On-going Commissioning - Investigation and Analysis.
Envelope requirements of ASHRAE 91.1-2007
CI-2009 EAp2:Minimum Energy Performanceposted by Cristina Valenzuela on
My client is doing an interior renovation of a small office at the ground floor in an existing mixed-use building.
Hospital operation room retrofit project certified under LEED CI
posted by James Chueh on
Hi, My question is simple (or so it seems): Is it possible for a hospital operation room retrofit project certified under LEED CI? We found out in one of Harvard Campus LEED projects, a laborato
Define "Owner" on a CI Project
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Andrew Laing on
Is the "Owner" the building owner/manager, or the tenant on CI project, assuming it is a multi-tenant building where the tenant and owner are not the same...?
Process for corrective action
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Maya Karkour on
Hello, One of the requirements of EA Credit 5.2 is to "provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved".
Gross ARI rated cooling capacity
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Devani PERERA on
Hi, Where should I get the "gross ARI rated cooling capacity" for air to water heat pumps ? This is not covered by ARI 550/590 which usually applies to chillers.