Forum quick links
Dance studio views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Norma Lehman on
this dance studio has windows that provide a "connection between indoor spaces and outdoors" with views to the sky.
Narrative on Data Collection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Xun Jia on
Can anyone help with the text box asking for a description of the data collection methodology etc.? We are using option 3. The survey went out to everyone and we got 66% participation.
Define "no new parking" - project site is a former parking lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jill Ziegler on
My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only.
Occupant diversity
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
Im working on a C&S building and we have two space types: office and meting rooms. I would like to know if I can use occupant diversity (D) for the outdoor air calculations.
Electric Rates
Schools-2009 EAc1:Optimize Energy Performanceposted by Laura Long on
The electric company for our school project offers a rate structure which includes a lower rate for heat pumps.
Unnecessary Permanent Irrigation
Schools-2009 WEc1:Water Efficient Landscapingposted by Tim Hoeft on
Our landscape designer has assured us that the native plant design will not require irrigation once established.
Minumum sight line height in existing building
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan Di Giulio on
I think I know the answer to this, but it's not the answer I want, so I'll throw it out there: I am working on an extensive remodel of a University dorm.The bottom of the existing rough wall openin
registering after construction starts
posted by Tristan Roberts on
Guillermo, this should not be a problem from what you have said so far.
M&V data reporting
NC-2009 EAc5:Measurement and Verificationposted by Joseph Greene on
Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Are templates available for data reporting and is there a required format?
Option 2: Restrictions?
CI-2009 SSc1:Site Selectionposted by on
Our project has a campus designed for 5 buildings. One building and the entire site was built out and received LEED Certified in 2004.