Forum quick links
FTE for residential project Case 3 of LEED CS
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Paola Figueiredo, Newton Figueiredo on
I have a question to calculate the FTE for a residential project (2 towers in one condominium of one building).
Transportation Canopies
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Aliesa Adelman on
We have a project where caopies at an intermodal station are considered a roof system by code yet are not attached to the facility and do not fall under the LEED definition of a roof.
Mechanical Schedules
posted by David Eldridge on
This usually will be the portion of the construction documents that show the major HVAC equipment in tabular form.
How to model slab-on-grade floor in simulation program
NC-2009 EAp2:Minimum Energy Performanceposted by lin wang on
As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr
ASHRAE Mandatory Provisions for Power
NC-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
I'm working on LEED for a stadium, and we have a bit of trouble interpreting requirements of ASHRAE 90.1 -2007 section 8. The project will have a tranformer that will filter the high voltage.
Exposed slopes
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According
Low Flow Kitchen Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jay Murray on
We are renovating and entire floor (43,000 office space square feet).
Non-structural wall resurfacing
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by James Ketter on
Our project has existing non-structural plaster walls that will be reused in place.
Removal % in LEED reference guide table.
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Emmanuel Pauwels on
If I understand correclty, we can use the table in the reference guide with several BMPs to determine the removal efficiency.
GIB prereq 4 for projects registered during stage 2
posted by Jutta Berns on
we have a LEED ND project in South Africa, which we registered early this year at Stage 2.