Forum quick links
Unconditioned or conditioned
NC-2009 EAp2:Minimum Energy Performanceposted by Camilo Velez on
We are working on a new office building that is designed to use natural ventilation, the building hasn't a HVAC system. We are defining the space conditioning categories for EaP2.
Timeline for Site Assessment
Schools-2009 SSp2:Environmental Site Assessmentposted by Brian Moran on
Does LEED 2009 require that the site assessment be performed within so many years of project construction?
Bamboo
NC-2009 MRc6:Rapidly Renewable Materialsposted by Carolina Vergnano on
We know that bamboo can be conted in the rapidly renewable materials right?
How to include cost associated with rare building cleaning?
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Paul C on
This relates to a questioned I posed on the IEQ cleaning equipment forum in regards to where to draw the line.
Option 1: Only LEED-CS?
CI-2009 SSc1:Site Selectionposted by Jeremy Poling on
I can't find official language further elaborating on what "flavors" of LEED Certified buildings qualify. Can a LEED-CI project going into a LEED-EB certified building earn this credit?
VOC content - testing or calculation
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Reinhard Oppl on
Could anybody please explain to me whether you can declare VOC content on basis of the formulation, or will you always need a test for compliance with this credit?
CI IEQ p1 - Template Table
CI-2009 IEQp1:Minimum IAQ Performanceposted by Shannon Allison on
Do we have to use the template table or can we upload our own spreadsheet using the same calcs?
PIf4
posted by Susan Di Giulio on
This Project Information form asks for the URL of the ma image of the project's location. How do you do that?
Parking and Data center included?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sobral on
Our project includes one Data Center and a parking space.
Office building, Jeddah, Saudi A
EBOM-2009 EAc1:Optimize Energy Performanceposted by Lise Dannesboe on
We have established a rating for the building based on Case 2 Option 1 - beacause the building is not eligible for an Energy Star rating.