Forum quick links
Site LEED Boundary
CS-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
Project with only one parking space
NC-v4 LTc7:Reduced parking footprintposted by Ricardo Sá on
If a project has only one car parking space (and assuming that this number is wel below Parking Consulting Council recommendations for the project type) how can it comply with LTc7 (c
Baseline Ventilation Rate for Proposed design with DCV (not required under 6.4.3.9)
CS-2009 EAp2:Minimum Energy Performanceposted by Iqbal Khalilullah on
Dear Marcus,
I wish to ask you regarding the Baseline Ventilation rate.
Paints - epoxy covering: car parks pavements
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Ricardo Sá on
Hi there, I am working on a project that specified a paint for a covered car park pavements that is an epoxy covering using for pavement's signals.
LEED ACP Pilot Credits
posted by Allison Wilson on
I'm in search of anyone who's done a LEED ACP Pilot Credit.
More Than One Commingled Waste Hauler on a Job - 2 Streams?
NC-v4 MRc5:Construction and demolition waste managementposted by Patty Lloyd on
Hi, if a project has a demolition subcontractor who hires a commingled waste hauler for some of the demolition debris, and then during the construction phase of the project the GC hires a commingle
remote access
NC-v4 EAc3:Advanced energy meteringposted by Antonio Macedo Filho on
I'd like to know if the BMS collecting the meter data would already meet the requirement of remote access to the data or this data should be avaiable for all ocupants.
Subway - same as light rail?
NC-v4 LTc5:Access to quality transitposted by Maria Porter on
Hi! Subway stations fall into the second category (800 m/0.5 miles from the project site) right?
5% vegetation of the site area by grass block
CS-2009 WEc1:Water Efficient Landscapingposted by study topenergy on
Hi everyone, our project now has a vegetation ratio of 2.3% which is lower than required 5%, and there are a large number of the open parking areas on the ground.
Monitoring OA via calculation for IEQc1?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by David Gibney on
During one of our geek sessions the following conversation came up: would monitoring OA be allowed via a calculation? For example, say we’re monitoring supply air and return air.