Cooling Water Treatment
posted by Victoria Dubeau on
Is there any guidance or specification around the water treatment of a cooling water system.
Client wants to pursue C&S certification AFTER construction is complete.
posted by Kevin Brock on
Client wants to pursue C&S certification AFTER construction is complete.
Any chance at all this can be done?? THX
Project Certification Question
posted by Teaaron Frye on
My company completed a project in 2020 that was to be LEED certified (was Silver but the designers later realized midway thoughthe project that it wasn't possible) and I was brought in to try
MDF Base
NC-v4.1 EQc2:Low-Emitting Materialsposted by Allen Cornett on
Should MDF base be documented in the Low-Emitting Materials flooring category like wall base, or in the composite
MRc3 Sourcing of Raw Materials - purchase of reclaimed brick
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by chuck merritt on
We are currently sourcing materials for the exterior space of our project and were trying to figure out if locally reclaimed belgian blocks would be applicable to the MRc3 Sourcing of Raw Mate
Envelope commissioning report
NC-v4 EAc1:Enhanced commissioningposted by Diana Giraldo on
We have aproject that had envelope comissioning inspecton done, are there any samples of a report or any guidance for the consultant that completed the inspection?
Designated area for smoking
CI-v4.1 EQc3:Construction Indoor Air Quality Management Planposted by Judy Chin on
On the IAQ management plans, I have to include a no-smoking plan that prohibits the use of tobacco products.
Multitenant complex classification
NC-v4.1 SSc3:Open Spaceposted by on
Hi,
Has anyone had any experience with zoos, aquariums, or other amusement parks? Specifically, classifying them as multitenant complexes?
Appliance and Process Water Use
NC-v4 WEc2:Indoor water use reductionposted by Edgar Arevalo on
Just so I'm clear about this particular requirement, do I need to satisfy efficiency compliant appliance(s) in order for the project to be allowed to achieve the maximum amount of points based off
SSc6: Light Pollution Reduction - decomposed granite or local rock materials
NC-v4.1 SSc5:Heat Island Reductionposted by Kevin Gilleran on
Hi,
I have a client who will be crushing rock native to the local site (winery) for hardscape pathways as well as pathways on a vegetated roof.