Can I lock the credits not to be touched by other team members ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Is there any feature in LEED online to lock the credits not to be changed by other team members ?

2
Default Avatar
LEEDuser Expert
472 thumbs up
Sun May 24, 2015, 10:27 pm

Filed (2)exemp. performance credit under (1) ID in case one fail

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Hi, I filed two exemplary performance credit under the same Innovation in design in case one fails.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 6:52 pm

Lead Paint

Schools-2009 SSp2:Environmental Site Assessment
posted by  Adam Musante  on 

Generally speaking, is the presence of lead paint in an existing school from the 1950's cause for concern and must be addressed or else the prerequisite is not satisfied?

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Fri May 22, 2015, 5:45 pm

Can I defer any ID credit to submit it w/ construction package ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 1:23 pm

Where do I upload the response report for Design Final Package ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 1:22 pm

Thermal Comfort Survey

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Leed User  on 

I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and

5
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
27 thumbs up
Thu May 21, 2015, 10:08 pm

EAp2-4: Energy Star equipment: conversion from kWa to Watts

CI-2009 EAp2:Minimum Energy Performance
posted by  Sarah Simchuk  on 

I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.

4
Wed May 20, 2015, 6:14 pm

Where to find the Ecologo-certified products?

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Helen Samuel  on 

Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified?

2
President
Design Management Services
LEEDuser Premium Member
25 thumbs up
Tue May 19, 2015, 1:35 pm

EV Ready acceptable?

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Dylan Connelly  on 

For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?

2
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Mon May 18, 2015, 8:00 pm

EAc5 Option 3

NC-2009 EAc5:Measurement and Verification
posted by  Sheryl Swartzle  on 

Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up