Forum quick links
Title 24
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Viau on
Hi there My building has full T24 certification. I take it this will be satisfactory to achieve this Prereq? Thanks
fuel source
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Matthew VanSweden on
Our project is a three story Professional Office Building addition to an adjacent hospital.
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building that is served by the existing central plant.
TAB Report and Calculations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tom Liebel on
We have just received a request for additional clarification during our final review of our LEED-EBOM 2009 submission, asking us to confirm the date of our TAB report, and pointing us to the the Ca
LEED Online v4 for Multiple Buildings on a Campus
posted by Deborah Lucking on
LEED Online v4 was a surprise in more ways than one. The individual projects are now certified under the Master Site, which is certified under the Campus (the old "block"). All well and good.
How does LEED SSc6.1 calculate "Imperviousness"?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian O'Mara on
How does LEED SSc6.1 calculate "Imperviousness"?
WaterSense Labeled Products
NC-v4 WEp2:Indoor water use reductionposted by Rick Ellison on
Reference Guide indicates WaterSense label requirements are mandatory in U.S. Right now the program for the WaterSense label on toilet flushometers is still in draft stage.
Help w/ wrangling RECs.
CS-2009 EAc2:On-site Renewable Energyposted by Brian Salazar on
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site renewable energy. The energy is fed directly into the building and used by the building.
Questions about High-rise residential LEED Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Tommy Xing on
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.
Compliant area
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.