Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Re-roofing by Owner was done before starting our project

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Paul Duffy  on 

We are renovating a university building with goal of silver certification.

3
Default Avatar
glaserworks
LEEDuser Basic Member
3 thumbs up
Mon Nov 21, 2016, 3:25 pm

Exterior Applied Products: paving and athletic surfaces

NC-v4 EQc2:Low emitting materials
posted by  Allison Zuchman  on 

How should exterior paving and play surfaces be addressed in the Low-Emitting credit, Exterior Applied Products product category?

8
Senior Sustainability Consultant
The Green Engineer
LEEDuser Basic Member
12 thumbs up
Fri Nov 18, 2016, 6:16 pm

100% well or non-potable water

EBOM-v4 WEc3:Cooling tower water use
posted by  Elizabeth Dunn  on 

Our building uses 100% well or non-potable water.

6
President/CEO
Envision Realty Services
LEEDuser Premium Member
2 thumbs up
Thu Nov 17, 2016, 11:56 pm

Achieving Innovation Design: MRc2 (95%)

NC-2009 MRc2:Construction Waste Management
posted by  James Goldfield  on 

Hello Everyone, I am currently on a project where one of our goals is to achieve Innovation Design: MRc2 Exemplary Performance (95%).

3
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Nov 14, 2016, 5:10 pm

Multiple Street Frontages

Pilot-Credits PC14:Walkable Streets
posted by  Carrie Webster  on 

Our project is on a corner and has two street frontages, with the primary façade on the "main street" and one side along a side street.

2
Default Avatar
Designer
Glave and Holmes Architecture
LEEDuser Basic Member
0 thumbs up
Sun Nov 13, 2016, 12:15 am

Energy Recovery Bypass

NC-2009 EAp2:Minimum Energy Performance
posted by  Kalyan Nishtala  on 

Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.

2
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Fri Nov 11, 2016, 5:09 pm

Future Alternative Compliance Paths

Pilot-Credits PC14:Walkable Streets
posted by  Douglas Flandro  on 

I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar

2
Default Avatar
LPAS Architecture + Design
LEEDuser Basic Member
0 thumbs up
Tue Nov 8, 2016, 1:37 pm

C&D Waste Recycling Calculations for 200 yr-old bldg renovation

NC-2009 MRc2:Construction Waste Management
posted by  Debra a. Lombard  on 

C&D Waste Recycling Calculations for 200 yr-old bldg renovation: This 200 yr-old brick building had a tremendous amount of old brick that was falling apart and needed to be taken out and re-po

2
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Nov 4, 2016, 5:07 pm

Included wooded area in LEED boundary?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Erica Downs  on 

The project is on a college campus, and the site itself if previously developed.

3
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Nov 3, 2016, 9:11 pm

Applicable spec divisions for MRc3

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Chris Sanders  on 

Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Oct 27, 2016, 2:36 pm