Forum quick links
Multifamily Buildings
EBOM-v4 WEp1:Indoor water use reductionposted by Zachary Sherman on
For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?
Project has all 5 Categories
Schools-2009 WEc4:Process water use reductionposted by Sara Zoumbaris on
Hi all, My project has all 5 categories installed (dishwasher with racks, pre rinse etc..), however one of the products is above the maximum limit.
EAp2
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Peter Doo on
If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance Form
<500 Miles
NC-2009 MRc5:Regional materialsposted by Erika Duran on
Sometimes I receive a letter from a manufacturer stating that a material is harvested and manufactured within 500 miles of the project site however for proprietary reasons, they cannot disclose the
Never Have Cooling Towers
Pilot-Credits WEpc17:Cooling tower water useposted by Janice Rogers on
We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?
Bank-Financial Institution
NC-2009 PIf3:Occupant and Usage Dataposted by Joseph Blanco on
How would I calculate transit occupancy for a bank. They have 13 FTE.
Future Reclaimed Water Service
NC-2009 WEc1:Water efficient landscapingposted by Annalise Reichert on
I am working on a project that is installing reclaimed/recycled water lines to the project, with the goal to offset 60% of irrigation water with recycled water.
Number of Showers
CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Melanie Silver on
I have a very large Core & Shell office building that is over 300,000 square feet.
[Innovation Credit] Bicycle Alternative
Schools-EBOM-v4 INc1:Innovationposted by JOHN COOK on
Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.
Independent Waste Stream Auditor Needed
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Michelle Bracewell-Musson on
My project is in Fresno, California, and we are in need of a company that can perform this type of audit for our medium sized Manufacturing Facility.