Reviewer requires cutsheets
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to as
Glare Control for Regularly Occupied Spaces
NC-v4.1 EQc6:Interior Lightingposted by Lauren Kottis on
"For all regularly occupied spaces, meet one of the following requirements:
LPD for IT Rooms and IT Closet
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
So according to 2010 ASHRAE 90.1, there is no LPD requirements for IT closets. Yet the lighting for the project in question was adhereing to the ASHRAE 2016 90.1 standard, which has a space t
Can someone with old LEED AP credentials
CI-v4 INc2:LEED Accredited Professionalposted by Edgar Arevalo on
For the LEED CI project that I'm currently working on. We are looking to pursue the LEED Accredited Professional credit, the thing is I would use my credentials but it's only for LEED AP BD+C
AEDG for Libraries
CI-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
I have a CI project for a Library. The team is looking to pursue prescriptive compliance for this credit. The issue is when attempting to complete the AEDG table, I don't know which cat
Humidity controls in baseline model
NC-v4 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
Cool wall requirements valid for colder climate zones?
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Brian Trimble on
Some jurisdictions across the US are starting to address the heat island effect by instituting various requirements for cool roofs and pavements.
WaterSense no longer applicable to sensor-equipped lavatory faucets?
NC-v4 WEp2:Indoor water use reductionposted by Brian Salazar on
Hi all - So, this one has snuck up on me. Working on several commercial/office projects now; helping to specify restroom fixtures.
Telecommute Option in Arc Transportation Survey
EBOM-v4.1 LTp1:Transportation Performanceposted by on
Hello all,
LEED CI parking
CI-v4 LTc5:Reduced parking footprintposted by Donna Juselis on
Our project is a remodel of the 2nd floor of a 3 story office building (CI v4).