Forum quick links
Slab on grade and concrete piers
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Tom Martin on
Has the pressure differential requirement of at least 5 pascals for LEED v2009 IEQc5 Indoor and Chemical Source Pollutant Control been eliminated from the requirement of this credit?
EAcp66 Community Contaminant Prevention- Airborne Releases
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team found the Community Contaminant Prevention- Airborne Releases to be a great pilot credit to continue working toward a more pure indoor air quality.
Form (V06) product data samples
CI-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Zachary Tetreault on
Does anyone know with the New Form (V06) do we no longer have to upload more than 20% of the product sheets?
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.
Showers in group projects
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Stacey Olson on
This piggy-backs to my previous comment about bike rack locations. Per the published Campus/Group Eligibility Credits & Prerequisites for LEED 2009, SSc4.2 - Alternative Transportation Bicycle
Recycled Water
CI-v4 WEc1:Indoor water use reductionposted by ESD Engineer on
The building our project is located in uses municipally supplied recycled water to serve the supply to the water closets and urinals. Can this be used to calculate additional savings?
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum energy performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.
Any HAP Expert?
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.