Bicycle Shower Facilities
NC-v4 LTc6:Bicycle facilitiesposted by S. Sachs on
Follow up question to Miles's question about the shower facilities in an adjacent building: I have a similar building that is being built part of a school campus, in which the building adjacent t
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.
Special Needs Student Equipment (Schools 2009)
Pilot-Credits EQpc78:Design for active occupantsposted by Cynthia Kaplan on
Has anyone had success with this pilot credit by including "active" furniture for special needs students?
DES Option 2 when project contains the DES
NC-2009 EAc1:Optimize Energy Performanceposted by Stephanie Graham on
Project is LEED-NC v2009 project in which a building contains a DES that serves the project building as well as a larger adjacent building.
Pot washing sink
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Christine Harvey on
I saw a comment on this site that implied the water used for pot washing sinks and kitchen food prep sinks can be excluded from the calculations, can someone verify that for me?
Power Line Overhead?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Cindy Quinn on
Our LEED boundary has a power line easement running through it. The city's zoning doesn't allow development in this area.
Resuspension of particles from flooring?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Roger Lewis on
Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?
Can we write up this plan and use it as the basis for our EBOM?
Pilot-Credits SSpc64:Site improvement planposted by Katherine Carlin on
Hi there, We are wondering if we can get a pilot credit for creating this plan by identifying everything that we are doing this year for our EBOM.
No floor
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by April Ambrose on
A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.
Existing Biofuel Station on Campus
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by GTF CPRE on
Our project is on a university campus that has an existing biofuel station for fleet vehicles.