Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

How does GBCI ccalculate reclaimed water reduction?

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  David Gibney  on 

This is an academic problem that I need confirmation for. It’s a LEED-NC 2009 project. • 242 FTEs. No visitors, etc. 50:50 gender ratio = 121 of each.

1
Fri Nov 27, 2015, 7:32 pm

Surrounding Density - Previously Developed Site

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Dana Waters  on 

In the Required Documentation section of the Reference Guide, it states that a project must provide a "description of the previous development on the site." How does USGBC define the "site" in thi

1
Mon Feb 8, 2016, 11:53 pm

IEQc5 Daylight Measurements

EBOM-v4 EQc5:Daylight and quality views
posted by  Alexa Stone  on 

Does the daylight measurement need to show compliance at both measurements to achieve the credit? We are making improvements that comply on the 2nd measurement. Please advise and thanks.

1
Tue May 30, 2017, 10:27 pm

CI MRc2 Concrete & Brick

CI-2009 MRc2:Construction Waste Management
posted by  Joseph Sneed  on 

I have a project that has a lot of brick & concrete demolition. This will be used as "clean fill" at a Metrofill site located somewhere else and not taken to a "landfill".

1
Mon Nov 10, 2014, 3:22 pm

MPR3 - Hotel in Mixed Use Building

CI-2009 MPR3:Must use a reasonable site boundary
posted by  Sara Zoumbaris  on 

Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.

0

Hotels: separate surveys & corrective measures 4 guests & FTEs?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Susan Di Giulio  on 

HI, Continuing the Hotel conversation, the 2013 IEQ matrix indicates that guestrooms, front desk and BOH - housekeeping areas should be included for IEQc7.2.

1
Wed Aug 2, 2017, 3:38 am

MRc5 Material Tracking/Documentation

CS-2009 MRc5:Regional Materials
posted by  Maggie Hogan Skaug  on 

RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.

0

Task Lights in Scope

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jonathan Weiss  on 

Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.

1
Mon Nov 30, 2015, 11:56 pm

Dirt road?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  emily reese moody  on 

This is the first time I've had a project that has both existing and new dirt roads that will not be paved, or covered with gravel, or anything else. I'm not really concerned about the SRI aspect (

1
Sat Jan 7, 2017, 10:54 pm