Copy area in office - acoustical treatment

CI-v4 EQc9:Acoustic performance
posted by  Leticia SooHoo  on 

Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.

1
Thu Jan 19, 2017, 9:22 pm

Existing HVAC system efficiency

CI-v4 EAp2:Minimum energy performance
posted by  Richard Mathews  on 

Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.

1
Wed Jan 18, 2017, 11:51 pm

Different equipment types or all equipment units in scope

CI-2009 EAp3:Fundamental Refrigerant Management
posted by  Edgar Arevalo  on 

For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.

1
Wed Jan 18, 2017, 10:50 pm

Daylight and Views - RP For Earning 1 Point For Just Daylight?

EBOM-2009 RPc1:Regional Priority
posted by  Michelle Bracewell-Musson  on 

Hello, To earn EP, a project must earn 75% for Daylight AND 90% for Views. For Regional Priority, can it just be meeting the 50% of only DAYLIGHT, to earn the Regional Priority point?

1
Thu Mar 10, 2016, 4:08 am

Adhesive- expansion joints

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stephanie Santiago  on 

Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be

1
Fri Oct 3, 2014, 4:13 pm

Previously Developed AND Wetlands

NC-v4 LTc2:Sensitive land protection
posted by  Becky Johnson  on 

My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.

1
Thu Mar 3, 2016, 8:37 pm

LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed

NC-2009 IEQc2:Increased Ventilation
posted by  Todd Tewksbury  on 

Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd

1
Fri Jun 16, 2017, 7:33 am

LEED Online Form Help for Process Water

Retail-CI-v2009 WEp1:Water use reduction
posted by  Sara Zoumbaris  on 

Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.

0

Pursing credit in an existing building

Pilot-Credits EQpc78:Design for active occupants
posted by  Dee Spiro  on 

Our project involves renovating an existing building on a university campus.

0

Required to use facility weighted average?

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Eileen Gohr  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje

0