Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
Daylight and Views - RP For Earning 1 Point For Just Daylight?
EBOM-2009 RPc1:Regional Priorityposted by Michelle Bracewell-Musson on
Hello, To earn EP, a project must earn 75% for Daylight AND 90% for Views. For Regional Priority, can it just be meeting the 50% of only DAYLIGHT, to earn the Regional Priority point?
Adhesive- expansion joints
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stephanie Santiago on
Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be
Previously Developed AND Wetlands
NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.
LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed
NC-2009 IEQc2:Increased Ventilationposted by Todd Tewksbury on
Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.
Required to use facility weighted average?
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Eileen Gohr on
"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje