Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!

1
Thu Jun 9, 2016, 3:30 pm

Determining site area on lot with multiple buidings

Mid-Rise-v4 SSc2:Rainwater management
posted by  Phil Vanderloo  on 

Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.

1
Mon Mar 7, 2016, 7:16 pm

Baseline system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  MKK LEED  on 

I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.

1
Tue Feb 14, 2017, 12:10 am

Increasing certification level after accepting certification?

General forums
posted by  Tommy Linstroth  on 

Is it possible to improve your certification level after accepting final certification?

1
Thu Apr 27, 2017, 8:58 pm

WEc3 denial

NC-2009 WEc3:Water Use Reduction
posted by  Therese Thompson  on 

We received our final review on Friday, and do not understand why Credit WEc3 was denied.

0

Enhance Cx, 10 month review of building operation

NC-2009 EAc3:Enhanced Commissioning
posted by  Laura Howe  on 

Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?

1
Fri Apr 1, 2016, 1:36 am

Roof Terrace Storm Drains

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Jeannie Rueter  on 

I'm working on a major remodel project next to the ocean.

1
Fri Jul 14, 2017, 2:30 pm

Refrigerant Atmospheric Impact

EBOM-v4 EAc8:Enhanced refrigerant management
posted by  Meier Corporate Account  on 

Good Morning, I am currently working on this credit and something in the guide (page 301) does not make much sense to me... At the top of the page in Table 3 it has the calculation for the RAI as

1
Fri Aug 19, 2016, 5:06 pm

C&S 2009 Retail tenant space

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  London Huenefeld  on 

I am working on a C&S project in which most of the tenants are retail stores.

1
Tue Sep 20, 2016, 4:11 pm

Existing MultiFamily High Rise-Exclude Occupied Commerical Space

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Laura Steinbrink  on 

We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.

1
Tue Mar 7, 2023, 4:30 pm