Forum quick links
Maximum frontage without windows on primary facade
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met".
What materials are to be included?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Thomas Button on
I have a project that was submitted under LEED BD+C Core & Shell.
Default recycled content for Aluminum or Glass?
CI-2009 MRc4:Recycled Contentposted by Charles Chaloeicheep on
Hello, My project is using aluminum and glass fabrications made in China and neither fabricators has any information about the recycled content.
Cold Climate
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
Volume Captured on the Stormwater Mgmt Calculator
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Kimberlee Dobbins on
Going from LEED-EB 2.0 SS credit 5.1 to LEED 2009, O&M, what is the number for "Volume Captured"?
Documentation
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by David Dixon on
Working on a v2009 BD+C project and using the credit as an ID credit looking for information on accepted documentation. Any insight will be helpful
aerosol line saver (also posted in IEQc4.1)
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lyle Axelarris on
I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Has anyone considered reporting the use of aerosol "line saver"?
How is an area/square footage assigned to a tree?
NC-2009 WEc1:Water Efficient Landscapingposted by Tricia Loe on
I have a plaza with 32 trees, with each in their own tree grate. I am trying to determine how to input this vegetation type into the EPA WaterSense calculator.
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Substantial Completion, C of O, TCO
posted by Erika Duran on
Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in