NC vs Homes vs Mid-rise: 5 story Senior Home
posted by Alejandra Menchaca on
We are working on a five-stories senior home, which program-wiise is very much like a dorm. From the ratings descriptions it seems we could for either NC, Homes or Mid-rise Residental, correct?
Building Flush - Filter Change?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Brianne Smith on
Our project is pursuing Option 1 Path 2 - Flush During Early Occupancy. Do filters need to be replaced after the flush, or only after construction as part of IEQc3.1?
Documentation for small sites without SWPPP
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Norma Lehman on
For the first year of construction, our project site area was smaller than the area that requires SWPPP inspections/reports.
PPM versus other units of measurement
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Jennifer Berg on
The current credit uses ppm units for all equipment. This is not a common measurement used or documented for generators.
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum Energy Performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Lead Lined Doors
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tim Murray on
We have a lead-lined door for a dentist x-ray room. The manufacturer cannot confirm that the particle board core is formaldehyde free.
Preproject water bodies
ND-Plan-v4 SLLp3:Wetlands and water body conservationposted by Sarah Kearney on
Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.
CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Baseline System configuration for mixed use condominium
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Biondi on
We are working on a 10 story mixed use building consisting of approx.
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Donna Juselis on
deleted