Forum quick links
Updated/clarified primer voc limit
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Martha Norbeck on
Can you please update the FAQ section of LEED-NC v2009, IEQc4.2. The information on primers is out of date per interpretation/addenda #100001805.
Replacing filters prior to occupancy
Schools-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Ashley Love on
We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
Pre-Rinse Spray Valves in Laboratories
NC-2009 WEp1:Water use reductionposted by Wyatt Suddarth on
I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa
Site Management Policy
posted by Kelsey Jensen on
When compiling the list of requirements for this policy I was wondering if there is a specific goal that must be met to be considered "low emissions" for maintenance equipment?
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
construction completion date is outside of performance period
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Jessica Hawley on
We are currently in our performance period for a project where a tenant fit out of a vacant floor is currently in the planning stages & construction may or may not start during our performance
Preferred parking on surface lot or in garage structure
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Deborah Lucking on
First of all, thanks to all for the lively discussion on LI 10202 (April through Sep 2013).
Uses in project boundary?
ND-Plan-v4 NPDc3:Mixed-use neighborhoodsposted by Sarah Kearney on
Hi Eliot, Do the uses on Appendix 1 need to be within the district boundary? We have a number of uses that will be within the boundaries but there are already some uses around the project boundary