Previously Developed AND Wetlands

NC-v4 LTc2:Sensitive land protection
posted by  Becky Johnson  on 

My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.

1
Thu Mar 3, 2016, 8:37 pm

LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed

NC-2009 IEQc2:Increased ventilation
posted by  Todd Tewksbury  on 

Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd

1
Fri Jun 16, 2017, 7:33 am

Filter Replacement

CS-2009 IEQc3:Construction IAQ management plan - during construction
posted by  Andrew Ellsworth  on 

BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.

1
Thu Dec 18, 2014, 4:42 pm

Deadline for Construction Review

General forums
posted by  M Bordeaux  on 

Is the cutoff of "(2) years past substantial project completion" for construction review submittal strictly enforced?

1
Sun Jul 10, 2016, 8:50 pm

Overhead Vegetation

NC-v4 SSc3:Open space
posted by  Katherine Bachman  on 

I am looking for clarification on what is considered to be 'overhead vegetation.' Per the LEED v4 Reference Guide, "a minimum of 25% of outdoor space must be vegetated or have overhead vegetated c

1
Thu Mar 26, 2015, 4:01 pm
1
Fri Jul 22, 2016, 5:23 pm

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of systems - lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

Multi-family Mid-rise EA Pre-req 1 - Option 2

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Pournamasi Rath  on 

Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%

1
Thu Jan 26, 2017, 8:53 pm

feedback

Pilot-Credits EApc65:Monitoring based commissioning
posted by  emily reese moody  on 

There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.

0

Baseline system for hybrid service hot water system

NC-2009 EAp2:Minimum energy performance
posted by  Vernon Smith  on 

Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t

1
Fri Apr 7, 2017, 1:26 pm