NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.
LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed
NC-2009 IEQc2:Increased ventilationposted by Todd Tewksbury on
Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd
Filter Replacement
CS-2009 IEQc3:Construction IAQ management plan - during constructionposted by Andrew Ellsworth on
BACKGROUND: We have a project that is an office building pursuing LEED-CS 2009 certification. The C&S was substantially complete within the last several weeks.
Deadline for Construction Review
posted by M Bordeaux on
Is the cutoff of "(2) years past substantial project completion" for construction review submittal strictly enforced?
Overhead Vegetation
NC-v4 SSc3:Open spaceposted by Katherine Bachman on
I am looking for clarification on what is considered to be 'overhead vegetation.' Per the LEED v4 Reference Guide, "a minimum of 25% of outdoor space must be vegetated or have overhead vegetated c
Design Engineer for EAp1 and CxA for EAc3
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Amy Harmon on
I've got a new building that is less than 50,000 SF.
90% controls for open office systems furniture
CI-2009 IEQc6.1:Controllability of systems - lightingposted by Brian VanAllen on
As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?
Multi-family Mid-rise EA Pre-req 1 - Option 2
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Pournamasi Rath on
Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%
feedback
Pilot-Credits EApc65:Monitoring based commissioningposted by emily reese moody on
There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.
Baseline system for hybrid service hot water system
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t