Campus Projects, overlapping boundaries
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
MPR Supplemental Guidance page 16 states that projects in phases may have an overlapping boundary. Let's say phase 1 included shared drive and parking and it does NOT earn SSc7.1 or SSc8.
Window coating and films
NC-v4 EQc2:Low emitting materialsposted by Edgar Arevalo on
Would window coating and films fall under Interior Paints and Coatings section for this credit, or do they not apply?
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize Energy Performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?
Master's Research Survey
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
77 Olfactory Comfort
posted by Carina Clark on
If a commercial project is looking to provide a kitchen/break room, some options include a separation by negative pressurization and hallways.
Enhanced Refrigerant Management - Purchased Cooling Loop
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Vinny Greco on
If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?
Above ground-floor horizontal exterior spaces (plaza, roof)
NC-v4 SSc6:Light pollution reductionposted by Jill Perry, PE on
Forgive me if this was covered elsewhere but I couldn't find it.
Final Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Benjamin McGrath on
For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.
Form (V06) product data samples
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Zachary Tetreault on
Does anyone know with the New Form (V06) do we no longer have to upload more than 20% of the product sheets?
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.