Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

(HERS) index score of at least 75

ND-v2009 GIBc2:Building energy efficiency
posted by  mugahid khatib  on 

for a residential LEED ND project seeking LEED ND Plan certification only, the Homes that are required to achieve at least 75 HERS index. is providing a RESNET HERS model enough , or should the h

1
Sat Oct 1, 2016, 8:52 pm

Heat Island Reduction when adjacent to existing building on lot

CS-v4 SSc5:Heat island reduction
posted by  Nadia Bini  on 

Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?

1
Tue Jul 11, 2017, 4:22 pm

ETS During Construction

NC-v4 EQp2:Environmental tobacco smoke control
posted by  L W  on 

Does the ETSC prerequisite apply during construction as well?

1
Thu May 7, 2015, 10:09 pm

Previously Developed or Not

CS-2009 SSc1:Site Selection
posted by  Kristopher Lashley  on 

Our current project is located on a plot of land that 3/4 of it was developed into commercial retail.

1
Wed Apr 1, 2015, 2:31 am

OPTION 3 METHOD

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Tim Gaidis  on 

Hi there, we are working on a project in St John's, Newfoundland and was wondering: 1. For Option 3 does Car Sharing only mean renting cars (i.e.

0

Sounds transmission - Ceilings and Floors

NC-v4 EQc9:Acoustic performance
posted by  Adam Stoker  on 

The LEED v4 acoustics calculator expands on the guidance provided in the credit and reference guide with respect to the sound transmission requirements and associated calculations.

1
Fri Oct 28, 2016, 3:30 pm

How to define affordable housing : rental and for-sale

ND-Plan-v4 NPDc4:Housing types and affordability
posted by  William Gagnon  on 

Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?

1
Tue Feb 21, 2017, 11:30 pm

25ft of entrace located near corner of building

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Mary Grace Wong  on 

Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?

1
Sat Aug 26, 2017, 3:39 pm

Thermostats with humidity and CO2

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Kristopher Lashley  on 

Hello all and a happy new year, I am wondering if anyone knows of a thermostat that can also measure and display humidity and CO2 levels? We are trying to find a way to cut down on the number of s

0

Does an indoor sewage pit need exahust for EQc5?

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Kristopher Lashley  on 

We have a project where there is a sewage pit located on floor P2 of the parking garage.

1
Tue May 26, 2015, 1:34 pm