Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

calculation of material cost

NC-2009 MRc5:Regional materials
posted by  Doreen Kruschina  on 

Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt

1
Mon Oct 20, 2014, 2:35 pm

Definition of street frontage

Pilot-Credits PC14:Walkable Streets
posted by  Florian Schmidtchen  on 

What is the right definition of street frontage?

0

Elevator lobbies -with airlocks?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.

0

certified projects

General forums
posted by  Bernadette Stauder-Buschlinger  on 

certified projects are still displayed and accessible at the new LEED Online?

1
Mon Jan 5, 2015, 9:42 pm

Shower in Units of gpc or USgpm in Form WEp1

CS-2009 WEp1:Water use reduction
posted by  Panagiota Dadinou  on 

Hello, a question concerning WEp1 Could I use the flow rate in Units of gallons per cycle (gpc) instead of USgallons per minute (USgpm) for the Shower as Fixture Family in Table WEp1-4.Flow Fixt

1
Thu Jan 21, 2016, 2:46 pm

Zero-lot line project - LEED requirements

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Mark Frey  on 

Hello, our project is located directly along a public sidewalk. There are several retail tenants in the project.

0

Brownfield remediation

NC-v4 LTc3:High priority site
posted by  Florian Schmidtchen  on 

In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).

1
Wed Dec 7, 2016, 11:35 am

Outdoor Airflow Measurement Device in AHUs

Schools-2009 IEQc1:Outdoor air delivery monitoring
posted by  Thomas Kohmann  on 

There are a few AHUs in the project for which I work. One AHU supplies less than 20% of the non-densely-occupied rooms with its air volume flow, but still has outdoor airflow measurement devices.

1
Thu Aug 31, 2017, 12:53 am

Tenant Area Modeling

CS-v4 EAp2:Minimum energy performance
posted by  Aaron Luthien  on 

Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area.

1
Fri May 5, 2017, 1:45 pm

District Cooling

NC-2009 EAc4:Enhanced refrigerant management
posted by  Mark Daub  on 

We have a MR V3.0 project that uses district cooling. First I thought this was great, as no refrigerants are used in the building. Now the district energy guidelines say, that we have to provide al

1
Fri Apr 17, 2015, 3:41 pm