Forum quick links
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
certified projects
posted by Bernadette Stauder-Buschlinger on
certified projects are still displayed and accessible at the new LEED Online?
Shower in Units of gpc or USgpm in Form WEp1
CS-2009 WEp1:Water use reductionposted by Panagiota Dadinou on
Hello, a question concerning WEp1 Could I use the flow rate in Units of gallons per cycle (gpc) instead of USgallons per minute (USgpm) for the Shower as Fixture Family in Table WEp1-4.Flow Fixt
Zero-lot line project - LEED requirements
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Mark Frey on
Hello, our project is located directly along a public sidewalk. There are several retail tenants in the project.
Brownfield remediation
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).
Outdoor Airflow Measurement Device in AHUs
Schools-2009 IEQc1:Outdoor air delivery monitoringposted by Thomas Kohmann on
There are a few AHUs in the project for which I work. One AHU supplies less than 20% of the non-densely-occupied rooms with its air volume flow, but still has outdoor airflow measurement devices.
Tenant Area Modeling
CS-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area.
District Cooling
NC-2009 EAc4:Enhanced refrigerant managementposted by Mark Daub on
We have a MR V3.0 project that uses district cooling. First I thought this was great, as no refrigerants are used in the building. Now the district energy guidelines say, that we have to provide al
ID+C - EQ Credit Interior Lighting - Lighting Sales areas
Retail-CI-v4 EQc6:Interior lightingposted by Valentin Grimaud on
HI, I am working on a store with two lighting types: furniture lighting and ambiant lighting. Only a part of the ambiant lighting is controlled depending on daylight illumination (40%).
Warehouse
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Anke Koch on
Dear LEED community, we are working on a project in Berlin, Germany.