Forum quick links
Air Curtain in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?
How can I filled the LEED Online form
CS-2009 WEc3:Water Use Reductionposted by Somsak Jidmon on
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w
Precision Air Conditioning for Server Room and Art Gallery
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Dear All We have two projects that are attempting LEED 2009 NC Certification the first one is office building with server room and the second one is Arg Gallery.
Envelope materials with no provided u-values
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, On our project we are getting supplied from local contractors materials like sandstone, granite, reused teak wood, and limestone.
Process load significantly lower than 25%
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
The overall process load of our project turns out to be in the vicinity of 15% only. We are aware that 15% is absurdly low and unusual for plants.
VAV Fan control for baseline system 6
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have a rough time seeking to reduce supply fan energy during energy simulations.
Process Load for Manufacturing
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Dear All, I have some question about my project, Our project is a cosmetic factory. Can I assume this project to Light Manufacturing type?
Recycling Facility Letters of Certification
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?