Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Project size extended in the middle of construction

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Sat Aug 26, 2017, 9:03 pm

Walk in Freezer Auto Light Shut off

NC-2009 EAp2:Minimum Energy Performance
posted by  John Covello  on 

Hello Everyone, Our resort project has 25 walk in freezers for food storage.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Feb 14, 2017, 7:48 am

Documentation: calculating grey water and rainfall - irrigation

NC-2009 WEc1:Water Efficient Landscaping
posted by  John Covello  on 

Hello Everyone, I am seeking further clarifications and suggestions regarding the clacuation for the use of grey water for irrigation and rainwater for our project.

3
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Sat Feb 4, 2017, 7:16 am

The overlap activities between CxA and CM Consultant

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Panupant Phapant  on 

Hi Can anyone share the CxA practice for LEED project in USA or other countries as we see that there are the overlap activities between the construction management consultant and CxA for LEED proje

6
Default Avatar
Technical Manager
VILANDCO
LEEDuser Basic Member
2 thumbs up
Mon Aug 29, 2016, 10:38 pm

Problem with FSC and COC shipped from other country.

NC-2009 MRc7:Certified Wood
posted by  Somsak Jidmon  on 

We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 - Certified Wood. We had looked and found the product of FSC label from China that we could use.

6
Senior Architect and LEED Consultant
GA Studio Co.,LTD.
LEEDuser Premium Member
1 thumbs up
Wed Dec 16, 2015, 3:29 am

Open Air Lobby/Drop off

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Covello  on 

Hello, I am working on a project in SE Asia. As with many resorts in SE Asia the lobby is sheltered but open to the exterior of the building.

5
Tue Nov 17, 2015, 11:26 pm

Baseline HVAC system choice

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10 Btu/h ft).

5
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue May 26, 2015, 3:02 pm

Fuel types of process energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

We have a new plant using NGV as a fuel to fry potato chip in Thailand.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat May 9, 2015, 1:23 am

Process Load of a factory applying LEED CS

CS-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell.

3
Tue Mar 31, 2015, 3:32 pm

Daylight dimming with manual electric curtain

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

My project has a dayligh dimming system and alos the curtain of each window. The reviewer ask me to add the effect of how this curtain will be modeled.

3
Tue Mar 31, 2015, 2:25 pm