prescriptive efficiency requirements ABCPG section 2.9

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Rahul Yadav  on 

Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.

1
Mon Nov 2, 2015, 2:17 pm

EA Prerequisite 2

CI-2009 EAp2:Minimum Energy Performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm

Thermal Comfort - ACP for Projects in India

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Gopinath Vasu  on 

Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con

1
Thu Dec 22, 2016, 9:26 pm

Site Management Policy but No Landscaping

EBOM-v4 SSp1:Site management policy
posted by  Nitesh Kumar J  on 

I'm looking for some guidance regarding Site management policy. There is no scope of landscaping or soil in the existing site, then how do we attempt this prerequisite.

1
Fri Mar 24, 2017, 11:00 pm

compliance for naturally ventilated spaces

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Poorva Keskar  on 

Referring to the FAQs fan-assisted ventilation in naturally ventilated spaces can be considered as mechanical ventilation.

1
Thu Aug 31, 2017, 5:37 pm

New Residential Building

NC-2009 EAp2:Minimum Energy Performance
posted by  SSN Energy Model  on 

Hi, We have completed the Energy Model for New Residential Building which will be located in India.

1
Thu Jun 2, 2016, 3:43 pm

Energy Submetering

EBOM-v4 EAc5:Advanced energy metering
posted by  VISHESH AGARWAL  on 

I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.

1
Wed Oct 5, 2016, 9:28 pm

Core and Shell - Retail

CS-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.

1
Thu Feb 2, 2017, 3:32 pm

Ventilation design-worst case conditions

CI-2009 IEQp1:Minimum IAQ Performance
posted by  S Nagarajan  on 

How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed

1
Fri Nov 19, 2021, 6:15 pm

Can a Retail CI Project achieve Water Cr if it has no Rest rooms

Retail-CI-v2009 WEc1:Water use reduction
posted by  Aswin M  on 

Can a Retail CI 2009 (restaurant) project achieve Water use reduction credit, if there is no Rest room in the (Retail CI) project scope.

1
Sat Aug 26, 2017, 11:50 pm