Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

net area vs gross area (simulation)

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Panagiota Dadinou  on 

Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t

0

ID+C - EQ Credit Interior Lighting - Lighting Sales areas

Retail-CI-v4 EQc6:Interior lighting
posted by  Valentin Grimaud  on 

HI, I am working on a store with two lighting types: furniture lighting and ambiant lighting. Only a part of the ambiant lighting is controlled depending on daylight illumination (40%).

1
Wed Jan 18, 2017, 6:31 pm

Do ruderal vegetation areas count as vegetated areas or roof

CS-2009 SSc5.2:Site development - maximize open space
posted by  Paul Deinhofer  on 

I'm working on a CS project (v2009) and I have a question concerning the definition of vegetated areas/roofs and the compliance with SSc5.2, SSc7.1, SSc7.2, etc.: Do ruderal vegetation areas (so no

1
Thu Jan 19, 2017, 2:12 pm

changes in appealed credit

General forums
posted by  Emmanuel Pauwels  on 

We have appealed the EAP2 credit succesfully in design phase. Now we are ready to submit for the construction review, but there are some changes in the EAP2 credit. How should we proceed?

0

20 or More Basic Services - Innovation Credit?

CS-2009 SSc2:Development density and community connectivity
posted by  Ian McCall  on 

Hello, Is it possible to get an innovation credit for projects that have 20 or more basic services (that are different)? Regards, Ian

1
Thu Jun 4, 2015, 11:44 am

Calculation grid for option 2

NC-v4 EQc7:Daylight
posted by  Sarah Leenknegt  on 

Hi, Regarding option 1, there are clear requirements to the calculation grid and evaluation plane. Do the same requirements apply for option 2? Thanks! Sarah

1
Mon Jan 25, 2016, 5:37 pm

C&S or NC ?

LEED Rating System Selection
posted by  Claire PIMET  on 

I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.

0

Brownfield remediation

NC-v4 LTc3:High priority site
posted by  Florian Schmidtchen  on 

In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).

1
Wed Dec 7, 2016, 11:35 am

Operable windows -ground floor or upperfloor?

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Florian Schmidtchen  on 

Dear Sir or Madam, Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows.

1
Mon Aug 14, 2017, 11:59 pm

calculation of material cost

NC-2009 MRc5:Regional materials
posted by  Doreen Kruschina  on 

Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt

1
Mon Oct 20, 2014, 2:35 pm