EBOM-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a industrial project registered in Existing building Operation and maintenance located Out of US , that have its own electricity production of 4 Mw through gas engines and its free
100% irrigation requirement met through treated waste water
NC-2009 WEc1:Water efficient landscapingposted by Yusuf Turab on
I find the credit language very confusing.
Mandatory 18% energy saving after April 2016
NC-2009 EAc1:Optimize energy performanceposted by Indochine Engineering VN on
Hi, I just read requirement of EAc1 on USGBC web page, is it true that all LEED New Construction projects registered after 8 April 2016 have to reach 18% - 4 points at minimum.
Broken Bricks, Tiles and waste materials
NC-2009 MRc3:Materials reuseposted by Yusuf Turab on
We have used large quantities of waste materials procured from manufacturers. We have procured waste material like broken bricks form the brick manufacturer.
Tenant is installing the entire energy systems at the building
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Michael Wahjudi on
Hi all, we have building where the tenant is installing the entire energy related system (ACMV, lighting, etc). The landlord only provide land and structural of the building.
Two buildings connected by a bridge
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Eric Bautista on
My apology for posting a query quite not related to this section. Can I register a project consisting of two (2) identical buildings connected by a suspended bridge and both located within the dec
Re-use of excavated rocks onsite for construction.
NC-2009 MRc2:Construction waste managementposted by Palak Varshney on
Project Location: India. The project construction site has rock bed. These rock are excavated, broken and re-used in construction on-site.
ASHRAE 90.1 Table 6.5.3.1.1A VS Table G3.1.2.9
NC-2009 EAc1:Optimize energy performanceposted by Ameet AA on
Hello, I'm confused with the two tables.
Minimum Energy Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Aqrab Ali Rana on
Dear All, I am working on a industrial project registered in Existing building Operation and maintenance located Out of US , that have its own electricity production of 4 Mw through gas engines a
Energy Simulation
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hello Marcus, i want some clarification regarding HVAC Baseline and Proposed model.