Meeting parking requirements for residential spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Magda Aghababyan on
Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.
EPA registered chemicals and new UL equivalent of CCD 146
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Pablo Fortunato Suarez on
My queries: A. Would procurement of EPA registered chemicals (not paper), as claimed by supplier, comply with LEED requirements for this credit & contribute to getting LEED points? B.
testing of existing plumbing fixtures
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Erin Holdenried on
We have a project that is undergoing major renovation and most of the existing plumbing fixtures will me maintained, and their flush and flow rates have been tested under the 0.9 bar municipal-supp
Floor joists part of interior?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by John Covello on
Hello, Are floor joists considered part of the building interior? So artificial wood used in the joists cannot have urea formaldehyde?
Platinum Certification
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM project final review and received 72 points. We had accepted the review and received Certified Gold Level.
Site Management Policy but No Landscaping
EBOM-v4 SSp1:Site management policyposted by Nitesh Kumar J on
I'm looking for some guidance regarding Site management policy. There is no scope of landscaping or soil in the existing site, then how do we attempt this prerequisite.
Modeling OA with Demand control ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have demand control ventilation for every AHU.
Is it too late to do SSp1?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Indochine Engineering VN on
Hi, My project is a hotel and client just decided to do LEED when Construction of structure is almost done.
link goes to the main USGBC home page
Pilot-Credits PC14:Walkable Streetsposted by Melissa Merryweather on
Hi, I am registered for this Pilot Credit.
Permanent Land /Space Requirement (MPRPp2)
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by al-emran hossain on
Hi LEED Expert , We want to know about Minimum Program Requirement (MPRPp2)of permanent space/land matter. Our client has 20 years lease land from BD Gov and build NC factory as a LEED Project .