Can I select my building as "Healthcare" in Portfolio Manager?
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Amornchai Challcharoenwattana on
My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
Weekly Log
EBOM-v4 WEc4:Water meteringposted by Kristina Pobre on
Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de
ASHRAE 55 - apartment
NC-2009 IEQc7.1:Thermal comfort - designposted by Indochine Engineering VN on
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.
Probability distribution of annual PV production.
NC-2009 EAc2:On-site renewable energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum energy performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Exterior windows and doors?
NC-2009 MRc1.2:Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?
Are changing rooms compulsory now as per revised credit form
CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing roomsposted by Priyadarsi Das on
In the earlier credit form, we had to enter the total number of showers/ changing rooms in the project.
ACP for Certified Wood vs Pilot for Legal Wood
posted by Terrapin BrightGreen on
The "LEED 2009 Global Alternative Compliance Paths Credit Table" (http://bit.ly/2ovIELH) does not include an ACP for C&S MRc6 Certified Wood, but there does exist a pilot for Legal Wood (http:/
Does all of Section 1.6 results have to be filled?
NC-2009 EAp2:Minimum energy performanceposted by Ivan Priatman on