Sports Practice Facility FTEs vs Transients
posted by David Browne on
I am working on an indoor practice facility for a university Division 1 athletic program and am having a difficult time deciding how to enter FTEs and transients in a project information form.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IDc1:Innovation in Designposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Compostable Trash Can Liners
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Kimberlee Dobbins on
Can anyone help me figure out under which Sustainable Criteria Compostable Trash Can Liners would fall under?
Can I lock the credits not to be touched by other team members ?
posted by Matt Dem on
Is there any feature in LEED online to lock the credits not to be changed by other team members ?
Filed (2)exemp. performance credit under (1) ID in case one fail
posted by Matt Dem on
Hi, I filed two exemplary performance credit under the same Innovation in design in case one fails.
Lead Paint
Schools-2009 SSp2:Environmental Site Assessmentposted by Adam Musante on
Generally speaking, is the presence of lead paint in an existing school from the 1950's cause for concern and must be addressed or else the prerequisite is not satisfied?
Can I defer any ID credit to submit it w/ construction package ?
posted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
posted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Thermal Comfort Survey
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Leed User on
I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and
EAp2-4: Energy Star equipment: conversion from kWa to Watts
CI-2009 EAp2:Minimum Energy Performanceposted by Sarah Simchuk on
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.