Forum quick links
Low Emitting Materials Tracking Spreadsheet
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Patrick Thibaudeau on
Is there a tracking spreadsheet for low emitting materials like there is for recycled content and regional materials.
RE: Would we exclude interior walls that were never permitted?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Diane Hale CHMM, CDGP, CEM, CESCO on
We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.
Stadium / Arena
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Stacey Olson on
I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
Service life of a piece of HVAC equipment?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Rosemary Ziemann on
The link above for the 2007 ASHRAE Applications Handbook, HVAC Applications seems to be broken.
Energy and Water Data Reporting
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Yaneth Galindo on
I registered the project in the Energy Start Portfolio website, but I realized the meter I subscribe is for more than one building, I have now water and electrical submeters and I would like to kno
Credit Denied
NC-2009 RPc1:Regional Priorityposted by Cynthia Estrada on
Hello All, Our project (zip 54703) just finished final design review and SSc1 was denied which was one of our RP credits as well.
Pilot vs v4 Demand Response - Full Automation
Pilot-Credits EApc8:Demand responseposted by Jennifer Wehling on
I have a LEED NC 2009 project that wants to use Demand Response as an Innovation Point.
Peak Transients
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by timothy thomas on
The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.
Bake Out?
NC-v4 EQc3:Construction indoor air quality management planposted by Rosemary Ziemann on
Hello, Is the strategy of using a "bake out" to remove VOCs from interior building materials advisable?