Rainwater Management question
Schools-NC-v4 SSc4:Rainwater managementposted by Karen Darley on
What is acceptable for 10 years historical data-is it necessary to enter daily rainfall for 10 years-or can average monthly for each of the 10 years-enter annual?
Design Engineer for EAp1 and CxA for EAc3
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Amy Harmon on
I've got a new building that is less than 50,000 SF.
ERV serving 3 different tenants
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Kristopher Lashley on
We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air.
want to get information about previous LEED certified projects
NC-2009 PIf2:Project Summary Detailsposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Project diversion rate v. facility rate
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Deborah Ebersole on
If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin
Number of Products
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?
video conferencing equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Kristen Magnuson on
Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.
Over limit adhesive used while building is open
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jayme Antolik on
I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?