Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Rainwater Management question

Schools-NC-v4 SSc4:Rainwater management
posted by  Karen Darley  on 

What is acceptable for 10 years historical data-is it necessary to enter daily rainfall for 10 years-or can average monthly for each of the 10 years-enter annual?

0
1
Fri Jul 22, 2016, 5:23 pm

ERV serving 3 different tenants

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Kristopher Lashley  on 

We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air.

1
Mon Jan 23, 2017, 3:10 pm

want to get information about previous LEED certified projects

NC-2009 PIf2:Project Summary Details
posted by  Amir Salehi  on 

Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,

1
Fri Oct 21, 2016, 10:50 pm

Determining site area on lot with multiple buidings

Mid-Rise-v4 SSc2:Rainwater management
posted by  Phil Vanderloo  on 

Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.

1
Mon Mar 7, 2016, 7:16 pm

Project diversion rate v. facility rate

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Deborah Ebersole  on 

If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin

1
Thu Jan 12, 2017, 6:47 pm

Number of Products

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Ashley Hu  on 

Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?

1
Tue Jun 13, 2017, 2:11 pm

video conferencing equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  Kristen Magnuson  on 

Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.

1
Sun Mar 20, 2016, 11:56 pm

Over limit adhesive used while building is open

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jayme Antolik  on 

I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.

1
Fri Jun 2, 2017, 12:47 pm

Monitoring Period

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Mari Hamasaki  on 

What is the required monitoring period for this credit?

0