Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

New O & M Starter Kit IN Credits

NC-2009 IDc1:Innovation in Design
posted by  Kristen Callori  on 

Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i

1
Fri Dec 1, 2017, 12:24 am

"Conditioned Space?" - Free cooling with outside air

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, I am not sure whether to class mechanical rooms which are free cooled by outside air as "conditioned" for the purpose of the baseline (so the baseline would be on system 5 in this example).

1
Mon Dec 22, 2014, 3:40 pm

RCI CORR Information

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  John Danby  on 

I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.

0

Classification of PVC adhesive and Primer

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Randy Weatherly  on 

I have classified PVC water pipe glue as "PVC Welding Adhesives" and the Purple PVC primer as "Adhesive Primer for Plastic". Is this correct"

1
Mon Jun 27, 2016, 12:56 pm

Compliance for Existing Site Features

Pilot-Credits PC14:Walkable Streets
posted by  Vicki Rybl  on 

I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7.

0

Showerhead with multiple settings

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  AtSite Inc  on 

To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.

1
Wed Dec 21, 2016, 11:49 pm

Future Pedestrian Access

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rachel Weber  on 

We have a project that will meet SS2 once pedestrian access is available. Do you know if it is adequate to show the sidewalk is in the county's budget?

1
Fri Nov 27, 2015, 3:32 am

Preproject water bodies

ND-Plan-v4 SLLp3:Wetlands and water body conservation
posted by  Sarah Kearney  on 

Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.

1
Tue Feb 28, 2017, 5:16 pm

Masonry Flash Mastic

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Chris Moore  on 

Our masonry contractor submitted VOC documentation on Wire-Bond Aqua Flash Mastic with a VOC content of 270 g/L. I am first not sure if this needs to be submitted for IEQc4.1 or not.

1
Mon Oct 20, 2014, 3:43 pm

Off site signage for Low-Emitting- Hybrid parking spaces

Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Vada Kornegay  on 

If I have no parking spaces in my LEED boundary, is it ok to have my Low-Emitting parking adjacent to the site? forgive me if this has been answered/asked by someone else.

1
Wed Nov 25, 2015, 12:47 am