Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

25ft of entrace located near corner of building

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Mary Grace Wong  on 

Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?

1
Sat Aug 26, 2017, 3:39 pm

FTE of unoccupied gutted adjacent tenant

Credit Forums
posted by  Andrew Bennett  on 

under case 2 option 1 this space would not add any FTE to the building total right? v3 Commercial Interiors

0

Free Address vs. Full Flexibility

WELL v1 Building Standard Tip Sheet
posted by  Carina Clark  on 

WELL's Intent for feature 82 Individual Thermal Comfort is: To maximize and personalize thermal comfort among all occupants.

1
Thu Sep 7, 2017, 7:56 pm

Commercial Kitchen

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  José Solis  on 

I have a mixed use office building with the potential for restaurant tenants on the ground floor.

1
Fri Apr 8, 2016, 3:06 pm

Master's Research Survey

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati for my Master's thesis in support of my hypothesis.

0

Geothermal energy loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Tim Murray  on 

We are designing a classroom building on a university campus that will house a geothermal energy substation in its basement.

1
Fri Aug 25, 2017, 7:51 pm

<500 Miles

NC-2009 MRc5:Regional Materials
posted by  Erika Duran  on 

Sometimes I receive a letter from a manufacturer stating that a material is harvested and manufactured within 500 miles of the project site however for proprietary reasons, they cannot disclose the

1
Mon May 11, 2015, 1:41 am

ULEF documentation and LEED Online form

CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Erica Downs  on 

Hi all - I posted this under NC already, but have not received a response, so thought I would try here. How does one document use of a ULEF melamine in LEED Online?

1
Tue Aug 23, 2016, 6:18 pm

LEED-EBOM credit as ID credit

NC-2009 IDc1:Innovation in Design
posted by  Alfonzo Collins  on 

I was looking through LEED-EBOM and saw IEQc2.1, Occupant Comfort Survey. This seems like a pretty easy credit to achieve.

1
Wed Jul 22, 2015, 2:37 pm

VOC Limit - Thread Cutting Oils

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jason Biondi  on 

What is VOC limit for "Thread Cutting Oils" as per SCAQMD Standards to comply with LEED requirements ?

1
Tue Oct 27, 2015, 3:35 am