Forum quick links
LEED ND v3 Examination End Date
posted by Michael McElroy on
According to an update posted May 15 to http://www.usgbc.org/articles/leed-v4-credential-exams-coming-june-2014 "Exams for the LEED Green Associate, BD+C, ID+C and O+M will feature v4 content in J
LEEDv4 Homes - Parking Structure
Homes-v4 MPR2:Must use reasonable LEED boundariesposted by Sara Greenwood on
It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl
WEp1 - PIf3 link - new LEED on line
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Todd Bundren on
My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice).
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?
New Bus Depot: LEED BD+C or C+S?
posted by Cynthia Kaplan on
My project is the new construction of a 3,000 s.f. bus depot in a small city. Part of the space will be leased to a retailer at a later date, most likely a convenience store or coffee shop.
WELL credits and LEED Innovation points
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Meredith Chambers on
Can a WELL credit be used as a LEED Innovation point in v4? If so, can the list shown in Appendix C, Table A2 of the WELL Building Standard v1 Reference Guide be used to show compliance with v4 Pe
OPTION 3 METHOD
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Gaidis on
Hi there, we are working on a project in St John's, Newfoundland and was wondering: 1. For Option 3 does Car Sharing only mean renting cars (i.e.
LEED HC (major renovation) or CI (v4)?
posted by Heather Zeto on
I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.
Manufacturer Declaration Letter
NC-2009 MRc4:Recycled Contentposted by Rezkar Abdulmajeed on
We completed the design of our project in 2013 and start construction in 2014.
Can CARB’s ATCM 93120 (2008).
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Summer Gorder on
Can CARB ULEF (Ultra Low Emitting) composite wood ceiling tiles that meet ATCM 93120 (2008) comply with IEQ credit 4.4?